HTS Heading 4406
Railway or tramway sleepers (cross-ties) of wood
All 4 HTS codes under heading 4406 (railway or tramway sleepers (cross-ties) of wood), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4406
- 4406 Railway or tramway sleepers (cross-ties) of wood.
- 4406.11.00.00 Coniferous (under: Not impregnated) (m3, No.): General Free; Special none; Column 2 Free.
- 4406.12.00.00 Nonconiferous (under: Not impregnated) (m3, No.): General Free; Special none; Column 2 Free.
- 4406.91.00.00 Coniferous (under: Other) (m3, No.): General Free; Special none; Column 2 Free.
- 4406.92.00.00 Nonconiferous (under: Other) (m3, No.): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.