HTS Heading 4407
Wood sawn or chipped lengthwise, sliced or peeled, whether or not planed, sanded or end-jointed, of a thickness exceeding 6 mm
All 74 HTS codes under heading 4407 (wood sawn or chipped lengthwise, sliced or peeled), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4407
- 4407 Wood sawn or chipped lengthwise, sliced or peeled, whether or not planed, sanded or end-jointed, of a thickness exceeding 6 mm.
- 4407.11.00 Of pine (Pinus spp.) (under: Coniferous): General Free; Special none; Column 2 $1.70/m3.
- 4407.11.00.01 Finger-jointed (under: Of pine (Pinus spp.)) (m3).
- 4407.11.00.02 Treated with paint, stain, creosote or other preservative (m3).
- 4407.11.00.42 Rough (under: Eastern white pine (Pinus strobus) and red pine (Pinus resinosa)) (m3).
- 4407.11.00.43 Other (under: Eastern white pine (Pinus strobus) and red pine (Pinus resinosa)) (m3).
- 4407.11.00.44 Rough (under: Lodgepole pine (Pinus contorta)) (m3).
- 4407.11.00.45 Other (under: Lodgepole pine (Pinus contorta)) (m3).
- 4407.11.00.46 Rough (under: Southern yellow pine (Loblolly pine (Pinus taeda)), long leaf pine (Pinus palustris), pitch pine (Pinus rigida), short leaf pine (Pinus echinata), slash pine (Pinus elliottii) and Virginia pine (Pinus virginiana)) (m3).
- 4407.11.00.47 Other (under: Southern yellow pine (Loblolly pine (Pinus taeda)), long leaf pine (Pinus palustris), pitch pine (Pinus rigida), short leaf pine (Pinus echinata), slash pine (Pinus elliottii) and Virginia pine (Pinus virginiana)) (m3).
- 4407.11.00.48 Rough (under: Ponderosa pine (Pinus ponderosa)) (m3).
- 4407.11.00.49 Other (under: Ponderosa pine (Pinus ponderosa)) (m3).
- 4407.11.00.52 Rough (under: Other pine) (m3).
- 4407.11.00.53 Other (under: Other pine) (m3).
- 4407.12.00 Of fir (Abies spp.) and spruce (Picea spp.): General Free; Special none; Column 2 $1.70/m3.
- 4407.12.00.01 Finger-jointed (under: Of fir (Abies spp.) and spruce (Picea spp.)) (m3).
- 4407.12.00.02 Treated with paint, stain, creosote or other preservative (m3).
- 4407.12.00.17 Rough (under: Sitka spruce (Picea sitchensis)) (m3).
- 4407.12.00.18 Other (under: Sitka spruce (Picea sitchensis)) (m3).
- 4407.12.00.19 Rough (under: Other spruce) (m3).
- 4407.12.00.20 Other (under: Other spruce) (m3).
- 4407.12.00.58 Rough (under: Fir (Abies spp.)) (m3).
- 4407.12.00.59 Other (under: Fir (Abies spp.)) (m3).
- 4407.13.00.00 Of S-P-F (spruce (Picea spp.), pine (Pinus spp.) and fir (Abies spp.)) (m3): General Free; Special none; Column 2 $1.70/m3.
- 4407.14.00.00 Of Hem-fir (Western hemlock (Tsuga heterophylla) and fir (Abies spp.)) (m3): General Free; Special none; Column 2 $1.70/m3.
- 4407.19.00 Other (under: Coniferous): General Free; Special none; Column 2 $1.70/m3.
- 4407.19.00.01 Finger-jointed (under: Other) (m3).
- 4407.19.00.02 Treated with paint, stain, creosote or other preservative (m3).
- 4407.19.00.54 Having a minimum dimension less than 5.1 cm (m3).
- 4407.19.00.55 Having a minimum dimension 5.1 cm or more but less than 12.7 cm (m3).
- 4407.19.00.56 Having a minimum dimension 12.7 cm or more (m3).
- 4407.19.00.57 Other (under: Douglas-fir (Pseudotsuga menziesii)) (m3).
- 4407.19.00.64 Rough (under: Hemlock (Tsuga spp.)) (m3).
- 4407.19.00.65 Other (under: Hemlock (Tsuga spp.)) (m3).
- 4407.19.00.66 Rough (under: Larch (Larix spp.)) (m3).
- 4407.19.00.67 Other (under: Larch (Larix spp.)) (m3).
- 4407.19.00.68 Rough (under: Western red cedar) (m3).
- 4407.19.00.69 Other (under: Western red cedar) (m3).
- 4407.19.00.74 Rough (under: Yellow cedar (Chamaecyparis nootkatensis)) (m3).
- 4407.19.00.75 Other (under: Yellow cedar (Chamaecyparis nootkatensis)) (m3).
- 4407.19.00.76 Rough (under: Other cedar (Thuja spp., Juniperus spp., Chamaecyparis spp., Cupressus spp. and Libocedrus spp.)) (m3).
- 4407.19.00.77 Other (under: Other cedar (Thuja spp., Juniperus spp., Chamaecyparis spp., Cupressus spp. and Libocedrus spp.)) (m3).
- 4407.19.00.82 Rough (under: Redwood (Sequoia sempervirens)) (m3).
- 4407.19.00.83 Other (under: Redwood (Sequoia sempervirens)) (m3).
- 4407.19.00.92 Rough (under: Other) (m3).
- 4407.19.00.93 Other (under: Other) (m3).
- 4407.21.00.00 Mahogany (Swietenia spp.) (under: Of tropical wood) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.22.00 Virola, Imbuia and Balsa (under: Of tropical wood): General Free; Special none; Column 2 $1.27/m3.
- 4407.22.00.06 Balsa (Ochroma lagopus) (under: Virola, Imbuia and Balsa) (m3).
- 4407.22.00.91 Other (under: Virola, Imbuia and Balsa) (m3).
- 4407.23.01.00 Teak (under: Of tropical wood) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.25.00.00 Dark Red Meranti, Light Red Meranti and Meranti Bakau (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.26.00.00 White Lauan, White Meranti, White Seraya, Yellow Meranti and Alan (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.27.00.00 Sapelli (under: Of tropical wood) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.28.00.00 Iroko (under: Of tropical wood) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.29.02 Other (under: Of tropical wood): General Free; Special none; Column 2 $1.27/m3.
- 4407.29.02.06 Acajou d'Afrique (Khaya spp.), also known as African mahogany (m3).
- 4407.29.02.11 Anigre (Aningeria spp.), also known as Aningre, Aniegre or Anegre (m3).
- 4407.29.02.16 Keruing (Dipterocarpus spp.) (under: Other) (m3).
- 4407.29.02.20 Ipé (Tabebuia spp. or Handroanthus spp.), also known as Tahibo or Taheebo, LaPacho or Lapacho, Brazilian walnut and Patagonian walnut (m3).
- 4407.29.02.40 Andiroba (Carapa guianensis and C. procera), Padauk (Pterocarpus spp.), also known as Padouk (m3).
- 4407.29.02.60 Cedro (Cedrela spp.), also known as Spanish Cedar (m3).
- 4407.29.02.85 Jatoba (Hymenaea spp.), also known as Brazilian Cherry (m3).
- 4407.29.02.96 Other (under: Other) (m3).
- 4407.91.00 Of oak (Quercus spp.) (under: Other): General Free; Special none; Column 2 $1.27/m3.
- 4407.91.00.22 Red oak (under: Of oak (Quercus spp.)) (m3).
- 4407.91.00.63 Other (under: Of oak (Quercus spp.)) (m3).
- 4407.92.00.00 Of beech (Fagus spp.) (under: Other) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.93.00 Of maple (Acer spp.) (under: Other): General Free; Special none; Column 2 $1.27/m3.
- 4407.93.00.10 Hard maple (under: Of maple (Acer spp.)) (m3).
- 4407.93.00.20 Other (under: Of maple (Acer spp.)) (m3).
- 4407.94.00.00 Of cherry (Prunus spp.) (under: Other) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.95.00.00 Of ash (Fraxinus spp.) (under: Other) (m3): General Free; Special none; Column 2 $1.27/m3.
- 4407.96.00 Of birch (Betula spp.) (under: Other): General Free; Special none; Column 2 $1.27/m3.
- 4407.96.00.11 North American (Betula alleghaniensis, Betula papyrifera, Betula lenta, Betula nigra) (m3).
- 4407.96.00.13 European (Betula pendula, Betula pubescens), also known as Baltic, Russian or Chinese birch (m3).
- 4407.96.00.19 Other (under: Of birch (Betula spp.)) (m3).
- 4407.97.00 Of poplar and aspen (Populus spp.): General Free; Special none; Column 2 $1.27/m3.
- 4407.97.00.72 Yellow poplar (Liriodendron tulipifera) (m3).
- 4407.97.00.79 Other poplar; aspen; cottonwood (m3).
- 4407.99.02 Other (under: Other): General Free; Special none; Column 2 $1.27/m3.
- 4407.99.02.42 Hickory (Carya spp.) and pecan (Carya illinoensis, Carya pecan) (m3).
- 4407.99.02.61 Walnut (Juglans spp) (under: Other) (m3).
- 4407.99.02.63 Western red alder (Alnus rubra) (m3).
- 4407.99.02.95 Other nonconiferous (under: Other) (m3).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.