HTS Heading 4408
Sheets for veneering (including those obtained by slicing laminated wood), for plywood or for similar laminated wood and other wood, sawn lengthwise, sliced or peeled, whether or not planed, sanded, spliced or end-jointed, of a thickness not exceeding 6 mm
All 27 HTS codes under heading 4408 (sheets for veneering), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4408
- 4408 Sheets for veneering (including those obtained by slicing laminated wood), for plywood or for similar laminated wood and other wood, sawn lengthwise, sliced or peeled, whether or not planed, sanded, spliced or end-jointed, of a thickness not exceeding 6 mm.
- 4408.10.01 Coniferous (under: Sheets for veneering (including those obtained by slicing laminated wood), for plywood or for similar laminated wood and other wood, sawn lengthwise, sliced or peeled, whether or not planed, sanded, spliced or end-jointed, of a thickness not exceeding 6 mm): General Free; Special none; Column 2 20%.
- 4408.10.01.25 Douglas fir (under: Coniferous) (m2).
- 4408.10.01.45 Other (under: Coniferous) (m2).
- 4408.31.01.00 Dark Red Meranti, Light Red Meranti and Meranti Bakau (m2): General Free; Special none; Column 2 20%.
- 4408.39.02 Other (under: Of tropical wood): General Free; Special none; Column 2 20%.
- 4408.39.02.10 Spliced or end-jointed (under: Other) (m2).
- 4408.39.02.20 Acajou or Acajou d'Afrique (Khaya spp.), also known as African mahogany (m2).
- 4408.39.02.30 Anigre (Aningeria spp.), also known as Aningre, Aniegre or Anegre (m2).
- 4408.39.02.40 Ceiba (Ceiba spp.) (under: Other) (m2).
- 4408.39.02.50 Obeche (Triplochiton spp.), also known as Ayous (m2).
- 4408.39.02.60 Okoume (Aucoumea spp.) (under: Other) (m2).
- 4408.39.02.70 Sapele (Sapelli), Sipo or Utile (Entandrophragma spp.) (m2).
- 4408.39.02.91 Other (under: Other) (m2).
- 4408.90.01 Other (under: Sheets for veneering (including those obtained by slicing laminated wood), for plywood or for similar laminated wood and other wood, sawn lengthwise, sliced or peeled, whether or not planed, sanded, spliced or end-jointed, of a thickness not exceeding 6 mm): General Free; Special none; Column 2 20%.
- 4408.90.01.05 Ash (Fraxinus spp.) (under: Spliced or end-jointed) (m2).
- 4408.90.01.10 Birch (Betula spp.) (under: Spliced or end-jointed) (m2).
- 4408.90.01.15 Cherry (Prunus spp.) (under: Spliced or end-jointed) (m2).
- 4408.90.01.21 Maple (Acer spp.) (under: Spliced or end-jointed) (m2).
- 4408.90.01.31 Red (under: Oak (Quercus spp.)) (m2).
- 4408.90.01.37 Other (under: Oak (Quercus spp.)) (m2).
- 4408.90.01.45 Walnut (Juglans spp.) (under: Spliced or end-jointed) (m2).
- 4408.90.01.51 Other (under: Spliced or end-jointed) (m2).
- 4408.90.01.56 Ash (Fraxinus spp.) (under: Other) (m2).
- 4408.90.01.61 Birch (Betula spp.) (under: Other) (m2).
- 4408.90.01.66 Cherry (Prunus spp.) (under: Other) (m2).
- 4408.90.01.71 Maple (Acer spp.) (under: Other) (m2).
- 4408.90.01.76 Red (under: Oak (Quercus spp.)) (m2).
- 4408.90.01.81 Other (under: Oak (Quercus spp.)) (m2).
- 4408.90.01.87 Walnut (Juglans spp.) (under: Other) (m2).
- 4408.90.01.97 Other (under: Other) (m2).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.