HTS Heading 4409

Wood (including strips and friezes for parquet flooring, not assembled) continuously shaped (tongued, grooved, rebated, chamfered, V-jointed, beaded, molded, rounded or the like) along any of its edges, ends or faces, whether or not planed, sanded or end-jointed

All 47 HTS codes under heading 4409 (wood), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 4409

  • 4409 Wood (including strips and friezes for parquet flooring, not assembled) continuously shaped (tongued, grooved, rebated, chamfered, V-jointed, beaded, molded, rounded or the like) along any of its edges, ends or faces, whether or not planed, sanded or end-jointed.
  • 4409.10 Coniferous (under: Wood (including strips and friezes for parquet flooring, not assembled) continuously shaped (tongued, grooved, rebated, chamfered, V-jointed, beaded, molded, rounded or the like) along any of its edges, ends or faces, whether or not planed, sanded or end-jointed).
  • 4409.10.05.00 Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed (m3): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.10.10 Wood siding (under: Other): General Free; Special none; Column 2 2.2¢/m2.
  • 4409.10.10.20 Western red cedar (under: Resawn bevel siding) (m2, m3).
  • 4409.10.10.40 Other (under: Resawn bevel siding) (m2, m3).
  • 4409.10.10.60 Western red cedar (under: Other) (m2, m3).
  • 4409.10.10.80 Other (under: Other) (m2, m3).
  • 4409.10.20.00 Wood flooring (under: Other) (m2, m3): General Free; Special none; Column 2 33 1/3%.
  • 4409.10.40 Pine (Pinus spp.) (under: Standard wood molding): General Free; Special none; Column 2 5%.
  • 4409.10.40.10 End-jointed (under: Pine (Pinus spp.)) (m).
  • 4409.10.40.90 Other (under: Pine (Pinus spp.)) (m).
  • 4409.10.45.00 Other (under: Standard wood molding) (m): General Free; Special none; Column 2 5%.
  • 4409.10.50.00 Other (under: Wood moldings) (m): General Free; Special none; Column 2 40%.
  • 4409.10.60.00 Plain (under: Wood dowel rods) (m, m3): General Free; Special none; Column 2 5%.
  • 4409.10.65.00 Sanded, grooved, or otherwise advanced in condition (m, m3): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.10.90 Other (under: Other): General Free; Special none; Column 2 $1.70/m3.
  • 4409.10.90.20 Western red cedar (under: Other) (m2, m3).
  • 4409.10.90.40 Other (under: Other) (m2, m3).
  • 4409.21 Of bamboo (under: Nonconiferous).
  • 4409.21.05.00 Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed (m3): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.21.90.00 Other (under: Of bamboo) (m3): General Free; Special none; Column 2 $1.70/m3.
  • 4409.22 Of tropical wood (under: Nonconiferous).
  • 4409.22.05 Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed: General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.22.05.15 Jatoba (Hymenaea spp.), also known as Brazilian Cherry (m2, m3).
  • 4409.22.05.20 Ipé (Tabebuia spp. or Handroanthus spp.), also known as Tahibo or Taheebo, LaPacho or Lapacho, Brazilian walnut, and Patagonian walnut (m2, m3).
  • 4409.22.05.35 Santos mahogany (Myroxylon balsamum), also known as Cabreuva (m2, m3).
  • 4409.22.05.45 Cumaru (Dipteryx spp.), also known as Brazilian teak (m2, m3).
  • 4409.22.05.60 Other (under: Wood flooring (end-matched)) (m2, m3).
  • 4409.22.05.90 Other (under: Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed) (m2, m3).
  • 4409.22.10.00 Wood siding (under: Other) (m2): General Free; Special none; Column 2 4.3¢/m2.
  • 4409.22.25.00 Wood flooring (under: Other) (m2, m3): General Free; Special none; Column 2 8%.
  • 4409.22.40.00 Standard wood moldings (under: Wood moldings) (m): General Free; Special none; Column 2 5%.
  • 4409.22.50 Other (under: Wood moldings): General Free; Special none; Column 2 40%.
  • 4409.22.50.20 Durian (Durio spp.) (under: Other) (m).
  • 4409.22.50.40 Jelutong (Dyera spp.) (under: Other) (m).
  • 4409.22.50.60 Obeche (Triplochiton spp.), also known as Ayous (m).
  • 4409.22.50.90 Other (under: Other) (m).
  • 4409.22.60.00 Plain (under: Wood dowel rods) (m): General Free; Special none; Column 2 5%.
  • 4409.22.65.00 Sanded, grooved or otherwise advanced in condition (m): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.22.90 Other (under: Other): General Free; Special none; Column 2 $1.70/m3.
  • 4409.22.90.20 Cumaru (Dipteryx spp.), also known as Brazilian teak (m3).
  • 4409.22.90.30 Ipé (Tabebuia spp. or Handroanthus spp.), also known as Tahibo or Taheebo, LaPacho or Lapacho, Brazilian walnut and Patagonian walnut (m3).
  • 4409.22.90.45 Keruing (Dipterocarpus spp.) (under: Other) (m3).
  • 4409.22.90.60 Padauk (Padouk) or Narra (Pterocarpus spp.) (m3).
  • 4409.22.90.90 Other (under: Other) (m3).
  • 4409.29 Other (under: Nonconiferous).
  • 4409.29.06 Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed: General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.29.06.55 Wood flooring (end-matched) (under: Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed) (m2, m3).
  • 4409.29.06.65 Other (under: Wood continuously shaped along any of its ends, whether or not also continuously shaped along any of its edges or faces, all the foregoing whether or not planed, sanded or end-jointed) (m2, m3).
  • 4409.29.11.00 Wood siding (under: Other) (m2): General Free; Special none; Column 2 4.3¢/m2.
  • 4409.29.26 Wood flooring (under: Other): General Free; Special none; Column 2 8%.
  • 4409.29.26.30 Maple (Acer spp.) (under: Wood flooring) (m2, m3).
  • 4409.29.26.50 Birch (Betula spp.) and beech (Fagus spp.) (m2, m3).
  • 4409.29.26.60 Other (under: Wood flooring) (m2, m3).
  • 4409.29.41.00 Standard wood moldings (under: Wood moldings) (m): General Free; Special none; Column 2 5%.
  • 4409.29.51.00 Other (under: Wood moldings) (m): General Free; Special none; Column 2 40%.
  • 4409.29.61.00 Plain (under: Wood dowel rods) (m): General Free; Special none; Column 2 5%.
  • 4409.29.66.00 Sanded, grooved or otherwise advanced in condition (m): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4409.29.91.00 Other (under: Other) (m3): General Free; Special none; Column 2 $1.70/m3.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.