HTS Heading 4410

Particle board, oriented strand board (OSB) and similar board (for example, waferboard) of wood or other ligneous materials, whether or not agglomerated with resins or other organic binding substances

All 11 HTS codes under heading 4410 (particle board), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4410

  • 4410 Particle board, oriented strand board (OSB) and similar board (for example, waferboard) of wood or other ligneous materials, whether or not agglomerated with resins or other organic binding substances.
  • 4410.11.00 Particle board (under: Of wood): General Free; Special none; Column 2 40%.
  • 4410.11.00.10 Unworked or not further worked than sanded (m3, kg).
  • 4410.11.00.20 Surface-covered with melamine-impregnated paper (m3, kg).
  • 4410.11.00.30 Surface-covered with decorative laminates of plastic (m3, kg).
  • 4410.11.00.60 Other (under: Particle board) (m3, kg).
  • 4410.12.00 Oriented strand board (OSB) (under: Of wood): General Free; Special none; Column 2 40%.
  • 4410.12.00.10 Unworked or not further worked than sanded (m3, kg).
  • 4410.12.00.20 Other (under: Oriented strand board (OSB)) (m3, kg).
  • 4410.19.00 Other (under: Of wood): General Free; Special none; Column 2 40%.
  • 4410.19.00.10 Unworked or not further worked than sanded (m3, kg).
  • 4410.19.00.20 Surface-covered with melamine-impregnated paper (m3, kg).
  • 4410.19.00.30 Surface-covered with decorative laminates of plastic (m3, kg).
  • 4410.19.00.60 Other (under: Other) (m3, kg).
  • 4410.90.00.00 Other (under: Particle board, oriented strand board (OSB) and similar board (for example, waferboard) of wood or other ligneous materials, whether or not agglomerated with resins or other organic binding substances) (m3, kg): General Free; Special none; Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.