HTS Heading 5603

Nonwovens, whether or not impregnated, coated, covered or laminated

All 27 HTS codes under heading 5603 (nonwovens, whether or not impregnated, coated), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5603

  • 5603 Nonwovens, whether or not impregnated, coated, covered or laminated.
  • 5603.11.00 Weighing not more than 25 g/m2: General Free; Special none; Column 2 74%.
  • 5603.11.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.11.00.70 Nonwoven articles, ready for use and packaged for industrial, institutional or retail sale, whether or not separated, perforated or impregnated, not elsewhere specified or included (223) (kg).
  • 5603.11.00.95 Other (223) (under: Weighing not more than 25 g/m2) (m2, kg).
  • 5603.12.00 Weighing more than 25 g/m2 but not more than 70 g/m2: General Free; Special none; Column 2 74%.
  • 5603.12.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.12.00.70 Nonwoven articles, ready for use and packaged for industrial, institutional or retail sale, whether or not separated, perforated or impregnated, not elsewhere specified or included (223) (kg).
  • 5603.12.00.95 Other (223) (under: Weighing more than 25 g/m2 but not more than 70 g/m2) (kg).
  • 5603.13.00 Weighing more than 70 g/m2 but not more than 150 g/m2: General Free; Special none; Column 2 74%.
  • 5603.13.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.13.00.70 Nonwoven articles, ready for use and packaged for industrial, institutional or retail sale, whether or not separated, perforated or impregnated, not elsewhere specified or included (223) (kg).
  • 5603.13.00.95 Other (223) (under: Weighing more than 70 g/m2 but not more than 150 g/m2) (kg).
  • 5603.14 Weighing more than 150 g/m2 (under: Of man-made filaments).
  • 5603.14.30.00 Laminated fabrics (223) (under: Weighing more than 150 g/m2) (kg): General Free; Special none; Column 2 83.5%.
  • 5603.14.90 Other (under: Weighing more than 150 g/m2): General Free; Special none; Column 2 74%.
  • 5603.14.90.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.14.90.90 Other (223) (under: Other) (kg).
  • 5603.91.00 Weighing not more than 25 g/m2: General Free; Special none; Column 2 74%.
  • 5603.91.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.91.00.90 Other (223) (under: Weighing not more than 25 g/m2) (kg).
  • 5603.92.00 Weighing more than 25 g/m2 but not more than 70 g/m2: General Free; Special none; Column 2 74%.
  • 5603.92.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.92.00.70 Nonwoven articles, ready for use and packaged for industrial, institutional or retail sale, whether or not separated, perforated or impregnated, not elsewhere specified or included (223) (kg).
  • 5603.92.00.95 Other (223) (under: Weighing more than 25 g/m2 but not more than 70 g/m2) (kg).
  • 5603.93.00 Weighing more than 70 g/m2 but not more than 150 g/m2: General Free; Special none; Column 2 74%.
  • 5603.93.00.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.93.00.90 Other (223) (under: Weighing more than 70 g/m2 but not more than 150 g/m2) (kg).
  • 5603.94 Weighing more than 150 g/m2 (under: Other).
  • 5603.94.10 Floor covering underlays (under: Weighing more than 150 g/m2): General Free; Special none; Column 2 40%.
  • 5603.94.10.10 Of wool or fine animal hair (469) (m2, kg).
  • 5603.94.10.90 Other (under: Floor covering underlays) (m2, kg).
  • 5603.94.30.00 Laminated fabrics (223) (under: Other) (kg): General Free; Special none; Column 2 83.5%.
  • 5603.94.90 Other (under: Other): General Free; Special none; Column 2 74%.
  • 5603.94.90.10 Impregnated, coated or covered with material other than or in addition to rubber, plastics, wood pulp or glass fibers; "imitation suede" (223) (kg).
  • 5603.94.90.30 Thermal bonded, of staple fibers (223) (kg).
  • 5603.94.90.50 Obtained by mechanical entanglement, of staple fibers (223) (kg).
  • 5603.94.90.70 Of filaments (223) (under: Other) (kg).
  • 5603.94.90.90 Of staple fibers (223) (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.