HTS Heading 5604

Rubber thread and cord, textile covered; textile yarn, and strip and the like of heading 5404 or 5405, impregnated, coated, covered or sheathed with rubber or plastics

All 3 HTS codes under heading 5604 (rubber thread and cord, textile covered), with their duty rates from the 2026 HTS Revision 23. General duty 5% to 8.8%.

Every line of heading 5604

  • 5604 Rubber thread and cord, textile covered; textile yarn, and strip and the like of heading 5404 or 5405, impregnated, coated, covered or sheathed with rubber or plastics.
  • 5604.10.00.00 Rubber thread and cord, textile covered (201) (kg): General 6.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 5604.90.20.00 High tenacity yarn of polyesters, of nylon or other polyamides or of viscose rayon, impregnated or coated (201) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.
  • 5604.90.90.00 Other (under: Other) (kg): General 5%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.