HTS Heading 5605
Metalized yarn, whether or not gimped, being textile yarn, or strip or the like of heading 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal
All 2 HTS codes under heading 5605 (metalized yarn, whether or not gimped), with their duty rates from the 2026 HTS Revision 23. General duty 7.5% to 13.2%.
Every line of heading 5605
- 5605.00 Metalized yarn, whether or not gimped, being textile yarn, or strip or the like of heading 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal.
- 5605.00.10.00 Metal coated or metal laminated man-made filament or strip or the like, ungimped, and untwisted or with twist of less than 5 turns per meter (kg): General 7.5%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 81%.
- 5605.00.90.00 Other (201) (under: Metalized yarn, whether or not gimped, being textile yarn, or strip or the like of heading 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal) (kg): General 13.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR, MA,OM,P,PA,PE,S,SG); Column 2 81%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.