HTS Heading 5606

Gimped yarn, and strip and the like of heading 5404 or 5405, gimped (other than those of heading 5605 and gimped horsehair yarn); chenille yarn (including flock chenille yarn); loop wale-yarn

All 2 HTS codes under heading 5606 (gimped yarn), with their duty rates from the 2026 HTS Revision 23. General duty 8%.

Every line of heading 5606

  • 5606.00.00 Gimped yarn, and strip and the like of heading 5404 or 5405, gimped (other than those of heading 5605 and gimped horsehair yarn); chenille yarn (including flock chenille yarn); loop wale-yarn: General 8%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 5606.00.00.10 Containing elastomeric filaments (201) (kg).
  • 5606.00.00.90 Other (201) (under: Gimped yarn, and strip and the like of heading 5404 or 5405, gimped (other than those of heading 5605 and gimped horsehair yarn); chenille yarn (including flock chenille yarn); loop wale-yarn) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.