HTS Heading 5607
Twine, cordage, ropes and cables, whether or not plaited or braided and whether or not impregnated, coated, covered or sheathed with rubber or plastics
All 16 HTS codes under heading 5607 (twine, cordage), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.8%, some per unit.
Every line of heading 5607
- 5607 Twine, cordage, ropes and cables, whether or not plaited or braided and whether or not impregnated, coated, covered or sheathed with rubber or plastics.
- 5607.21.00.00 Binder or baler twine (under: Of sisal or other textile fibers of the genus Agave) (kg): General Free; Special none; Column 2 Free.
- 5607.29.00.00 Other (under: Of sisal or other textile fibers of the genus Agave) (kg): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5607.41 Binder or baler twine (under: Of polyethylene or polypropylene).
- 5607.41.10.00 Of wide nonfibrillated strip (under: Binder or baler twine) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 5607.41.30.00 Other (201) (under: Binder or baler twine) (kg): General 4%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 76.5%.
- 5607.49 Other (under: Of polyethylene or polypropylene).
- 5607.49.10.00 Of wide nonfibrillated strip (under: Other) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 5607.49.15.00 Measuring less than 4.8 mm in diameter (201) (kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 76.5%.
- 5607.49.25.00 Other (201) (under: Other, not braided or plaited) (kg): General 9.8¢/kg + 5.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 27.6¢/kg + 76.5%.
- 5607.49.30.00 Other (669) (under: Other) (kg): General 3.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5607.50 Of other synthetic fibers (under: Twine, cordage, ropes and cables, whether or not plaited or braided and whether or not impregnated, coated, covered or sheathed with rubber or plastics).
- 5607.50.25.00 3-ply or 4-ply multicolored twine having a final "S" twist, containing at least 10 percent by weight of cotton, measuring less than 3.5 mm in diameter (201) (kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 76.5%.
- 5607.50.35.00 Other (201) (under: Not braided or plaited) (kg): General 19.9¢/kg + 10.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 27.6¢/kg + 76.5%.
- 5607.50.40.00 Other (669) (under: Of other synthetic fibers) (kg): General 3.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 60%.
- 5607.90 Other (under: Twine, cordage, ropes and cables, whether or not plaited or braided and whether or not impregnated, coated, covered or sheathed with rubber or plastics).
- 5607.90.10.00 Of coir (under: Other) (kg): General Free; Special none; Column 2 Free.
- 5607.90.15.00 Of jute or other textile bast fibers of heading 5303 (kg): General Free; Special none; Column 2 20%.
- 5607.90.25.00 Of stranded construction measuring 1.88 cm or over in diameter (kg): General Free; Special none; Column 2 4¢/kg.
- 5607.90.35.00 Other (under: Of abaca (Manila hemp or Musa textilis Nee) or other hard (leaf) fibers) (kg): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5607.90.90.00 Other (201) (under: Other) (kg): General 6.3%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.