HTS Heading 5608

Knotted netting of twine, cordage or rope; made up fishing nets and other made up nets, of textile materials

All 10 HTS codes under heading 5608 (knotted netting of twine, cordage or rope), with their duty rates from the 2026 HTS Revision 23. General duty 5% to 14.1%.

Every line of heading 5608

  • 5608 Knotted netting of twine, cordage or rope; made up fishing nets and other made up nets, of textile materials.
  • 5608.11.00 Made up fishing nets (under: Of man-made textile materials): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 82%.
  • 5608.11.00.10 Hand-cast string-drawn (under: Made up fishing nets) (kg).
  • 5608.11.00.90 Other (229) (under: Made up fishing nets) (kg).
  • 5608.19 Other (under: Of man-made textile materials).
  • 5608.19.10 Fish netting (under: Other): General 8.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 82%.
  • 5608.19.10.10 Salmon gill netting, of nylon or other polyamides (229) (kg).
  • 5608.19.10.20 Other (229) (under: Fish netting) (kg).
  • 5608.19.20 Other (under: Other): General 5%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 5608.19.20.10 Bait bags with draw string closures (kg).
  • 5608.19.20.90 Other (229) (under: Other) (kg).
  • 5608.90 Other (under: Knotted netting of twine, cordage or rope; made up fishing nets and other made up nets, of textile materials).
  • 5608.90.10.00 Fish netting and fishing nets (kg): General 8%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 82%.
  • 5608.90.23.00 Hammocks (under: Of cotton) (kg): General 14.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 5608.90.27.00 Other (229) (under: Of cotton) (kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 5608.90.30.00 Other (under: Other) (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.