HTS Heading 5609

Articles of yarn, strip or the like of heading 5404 or 5405, twine, cordage, rope or cables, not elsewhere specified or included

All 4 HTS codes under heading 5609 (articles of yarn), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%.

Every line of heading 5609

  • 5609.00 Articles of yarn, strip or the like of heading 5404 or 5405, twine, cordage, rope or cables, not elsewhere specified or included.
  • 5609.00.10.00 Of cotton (under: Articles of yarn, strip or the like of heading 5404 or 5405, twine, cordage, rope or cables, not elsewhere specified or included) (kg): General 2.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 5609.00.20.00 Of vegetable fibers, except cotton (kg): General Free; Special none; Column 2 40%.
  • 5609.00.30.00 Of man-made fibers (under: Articles of yarn, strip or the like of heading 5404 or 5405, twine, cordage, rope or cables, not elsewhere specified or included) (kg): General 4.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 78.5%.
  • 5609.00.40.00 Other (under: Articles of yarn, strip or the like of heading 5404 or 5405, twine, cordage, rope or cables, not elsewhere specified or included) (kg): General 3.9%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.