HTS Heading 5701

Carpets and other textile floor coverings, knotted, whether or not made up

All 12 HTS codes under heading 5701 (carpets and other textile floor), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%.

Every line of heading 5701

  • 5701 Carpets and other textile floor coverings, knotted, whether or not made up.
  • 5701.10 Of wool or fine animal hair (under: Carpets and other textile floor coverings, knotted, whether or not made up).
  • 5701.10.13.00 Certified hand-loomed and folklore products (m2, kg): General Free; Special none; Column 2 45%.
  • 5701.10.16.00 Other (465) (under: In which the pile was hand-inserted or hand-knotted during weaving or knitting, with over 50 percent by weight of the pile being hair of the alpaca, guanaco, huarizo, llama, misti, suri or any combination of these hairs) (m2, kg): General Free; Special none; Column 2 45%.
  • 5701.10.40.00 Hand-hooked, that is, in which the tufts were inserted and knotted by hand or by means of a hand tool (465) (m2, kg): General Free; Special none; Column 2 45%.
  • 5701.10.90.00 Other (465) (under: Other) (m2, kg): General 4.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM, P,PA,PE,S,SG); Column 2 45%.
  • 5701.90 Of other textile materials (under: Carpets and other textile floor coverings, knotted, whether or not made up).
  • 5701.90.10 With pile inserted and knotted during weaving or knitting: General Free; Special none; Column 2 45%.
  • 5701.90.10.10 Hand-knotted (under: With pile inserted and knotted during weaving or knitting) (m2, kg).
  • 5701.90.10.20 Of cotton (369) (under: Other) (m2, kg).
  • 5701.90.10.30 Of man-made fibers (665) (under: Other) (m2, kg).
  • 5701.90.10.90 Other (under: Other) (m2, kg).
  • 5701.90.20 Other (under: Of other textile materials): General Free; Special none; Column 2 60%.
  • 5701.90.20.10 Hand-hooked, that is, in which the tufts were inserted and knotted by hand or by means of a hand tool (m2, kg).
  • 5701.90.20.20 Of cotton (369) (under: Other) (m2, kg).
  • 5701.90.20.30 Of man-made fibers (665) (under: Other) (m2, kg).
  • 5701.90.20.90 Other (under: Other) (m2, kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.