HTS Heading 5702
Carpets and other textile floor coverings, woven, not tufted or flocked, whether or not made up, including "Kelem", "Schumacks", "Karamanie" and similar handwoven rugs
All 36 HTS codes under heading 5702 (carpets and other textile floor), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.
Every line of heading 5702
- 5702 Carpets and other textile floor coverings, woven, not tufted or flocked, whether or not made up, including "Kelem", "Schumacks", "Karamanie" and similar handwoven rugs.
- 5702.10 "Kelem", "Schumacks", "Karamanie" and similar hand woven rugs.
- 5702.10.10.00 Certified hand-loomed and folklore products (m2, kg): General Free; Special none; Column 2 45%.
- 5702.10.90 Other (under: "Kelem", "Schumacks", "Karamanie" and similar hand woven rugs): General Free; Special none; Column 2 45%.
- 5702.10.90.10 Of wool or fine animal hair (465) (m2, kg).
- 5702.10.90.20 Of cotton (369) (under: Other) (m2, kg).
- 5702.10.90.30 Of man-made fibers (665) (under: Other) (m2, kg).
- 5702.10.90.90 Other (under: Other) (m2, kg).
- 5702.20 Floor coverings of coconut fibers (coir).
- 5702.20.10.00 With pile (under: Floor coverings of coconut fibers (coir)) (m2, kg): General Free; Special none; Column 2 $1.29/m2.
- 5702.20.20.00 Other (under: Floor coverings of coconut fibers (coir)) (m2, kg): General Free; Special none; Column 2 16%.
- 5702.31 Of wool or fine animal hair (under: Other, of pile construction, not made up).
- 5702.31.10.00 Wilton (including brussels) and velvet (including tapestry) floor coverings and floor coverings of like character or description (465) (m2, kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.31.20.00 Other (465) (under: Of wool or fine animal hair) (m2, kg): General 4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.32 Of man-made textile materials.
- 5702.32.10.00 Wilton (including brussels) and velvet (including tapestry) floor coverings and floor coverings of like character or description (665) (m2, kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.32.20.00 Other (665) (under: Of man-made textile materials) (m2, kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.39 Of other textile materials (under: Other, of pile construction, not made up).
- 5702.39.10.00 Of jute (under: Of other textile materials) (m2, kg): General Free; Special none; Column 2 35%.
- 5702.39.20 Other (under: Of other textile materials): General 3.6%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
- 5702.39.20.10 Of cotton (369) (under: Other) (m2, kg).
- 5702.39.20.90 Other (under: Other) (m2, kg).
- 5702.41 Of wool or fine animal hair (under: Other, of pile construction, made up).
- 5702.41.10.00 Wilton (including brussels) and velvet (including tapestry) floor coverings and floor coverings of like character or description (465) (m2, kg): General Free; Special none; Column 2 60%.
- 5702.41.20.00 Other (465) (under: Of wool or fine animal hair) (m2, kg): General Free; Special none; Column 2 60%.
- 5702.42 Of man-made textile materials.
- 5702.42.10.00 Wilton (including brussels) and velvet (including tapestry) floor coverings and floor coverings of like character or description (665) (m2, kg): General Free; Special none; Column 2 60%.
- 5702.42.20 Other (under: Of man-made textile materials): General Free; Special none; Column 2 60%.
- 5702.42.20.20 Not made on a power-driven loom (665) (m2, kg).
- 5702.42.20.80 Other (665) (under: Other) (m2, kg).
- 5702.49 Of other textile materials (under: Other, of pile construction, made up).
- 5702.49.10 Of cotton (under: Of other textile materials): General Free; Special none; Column 2 35%.
- 5702.49.10.20 Not made on a power-driven loom (369) (m2, kg).
- 5702.49.10.80 Other (369) (under: Of cotton) (m2, kg).
- 5702.49.15.00 Of jute (under: Of other textile materials) (m2): General Free; Special none; Column 2 35%.
- 5702.49.20.00 Other (under: Of other textile materials) (m2, kg): General 4%; Special Free (AU,B,BH, CL,CO,E*,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 60%.
- 5702.50 Other, not of pile construction, not made up.
- 5702.50.20.00 Woven, but not made on a power-driven loom (465) (m2, kg): General 4.3%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 5702.50.40.00 Other (465) (under: Of wool or fine animal hair) (m2, kg): General 6.3%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.50.52.00 Of man-made textile materials (665) (m2, kg): General 4.7%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
- 5702.50.56.00 Of cotton (369) (under: Of other textile materials) (m2, kg): General 6.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 45%.
- 5702.50.59.00 Other (under: Of other textile materials) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 40%.
- 5702.91 Of wool or fine animal hair (under: Other, not of pile construction, made up).
- 5702.91.20.00 Certified hand-loomed and folklore products (m2, kg): General Free; Special none; Column 2 45%.
- 5702.91.30.00 Other (465) (under: Woven, but not made on a power-driven loom) (m2, kg): General 4.3%; Special Free (A*,AU,BH,CL,CO,D,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 45%.
- 5702.91.40.00 Other (465) (under: Of wool or fine animal hair) (m2, kg): General 3.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM, P,PA,PE,S,SG); Column 2 60%.
- 5702.92 Of man-made textile materials.
- 5702.92.10.00 Woven, but not made on a power-driven loom (665) (m2, kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 5702.92.90.00 Other (665) (under: Of man-made textile materials) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM, P,PA,PE,S,SG); Column 2 40%.
- 5702.99 Of other textile materials (under: Other, not of pile construction, made up).
- 5702.99.05.00 Woven, but not made on a power-driven loom (369) (m2, kg): General 6.8%; Special Free (A*,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 5702.99.15.00 Other (369) (under: Of cotton) (m2, kg): General 6.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,NP,OM, P,PA,PE,S,SG); Column 2 45%.
- 5702.99.20.00 Other (under: Of other textile materials) (m2, kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.