HTS Chapter 57
Carpets and other textile floor coverings
The 5 headings and 74 HTS codes of chapter 57 (carpets and other textile floor coverings), with their duty rates from the 2026 HTS Revision 23.
The 5 headings of chapter 57
- 5701: Carpets and other textile floor coverings, knotted, whether or not made up (12 codes, General duty Free to 4.5%)
- 5702: Carpets and other textile floor coverings, woven, not tufted or flocked, whether or not made up, including "Kelem", "Schumacks", "Karamanie" and similar handwoven rugs (36 codes, General duty Free to 8%)
- 5703: Carpets and other textile floor coverings (including turf), tufted, whether or not made up (14 codes, General duty 3.8% to 6.7%)
- 5704: Carpets and other textile floor coverings, of felt, not tufted or flocked, whether or not made up (6 codes, General duty Free to 4.7%)
- 5705: Other carpets and other textile floor coverings, whether or not made up (6 codes, General duty Free to 3.3%)
Where it sits in the schedule
Chapter 57 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.