HTS Heading 5703
Carpets and other textile floor coverings (including turf), tufted, whether or not made up
All 14 HTS codes under heading 5703 (carpets and other textile floor), with their duty rates from the 2026 HTS Revision 23. General duty 3.8% to 6.7%.
Every line of heading 5703
- 5703 Carpets and other textile floor coverings (including turf), tufted, whether or not made up.
- 5703.10 Of wool or fine animal hair (under: Carpets and other textile floor coverings (including turf), tufted, whether or not made up).
- 5703.10.20.00 Hand-hooked, that is, in which the tufts were inserted by hand or by means of a hand tool (465) (m2, kg): General 6%; Special Free (A*,AU,B,BH,CL,CO,D,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 60%.
- 5703.10.80.00 Other (465) (under: Of wool or fine animal hair) (m2, kg): General 6%; Special Free (AU,B,BH,CL,CO,IL,JO, KR,MA,NP,OM, P,PA,PE,S,SG); Column 2 60%.
- 5703.21.00 Turf (under: Of nylon or other polyamides): General 6.7%; Special Free (AU,B,BH,CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5703.21.00.10 Measuring not more than 5.25 m2 in area (665) (m2, kg).
- 5703.21.00.90 Other (665) (under: Turf) (m2, kg).
- 5703.29 Other (under: Of nylon or other polyamides).
- 5703.29.10.00 Hand-hooked, that is, in which the tufts were inserted by hand or by means of a hand tool (665) (m2, kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 5703.29.20 Other (under: Other): General 6.7%; Special Free (AU,B,BH,CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5703.29.20.10 Measuring not more than 5.25 m2 in area (665) (m2, kg).
- 5703.29.20.90 Other (665) (under: Other) (m2, kg).
- 5703.31.00 Turf (under: Of other man-made textile materials): General 6%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5703.31.00.30 Measuring not more than 5.25 m2 in area (665) (m2, kg).
- 5703.31.00.60 In rolls of a width equal to or exceeding 1.0 meter, or in sheets measuring 1.0 meter or greater on any side (665) (m2, kg).
- 5703.31.00.85 Other (665) (under: Other) (m2, kg).
- 5703.39 Other (under: Of other man-made textile materials).
- 5703.39.10.00 Hand-hooked, that is, in which the tufts were inserted by hand or by means of a hand tool (665) (m2, kg): General 6%; Special Free (A,AU,B,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 5703.39.20 Other (under: Other): General 6%; Special Free (AU,B,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 60%.
- 5703.39.20.30 Measuring not more than 5.25 m2 in area (665) (m2, kg).
- 5703.39.20.90 Other (665) (under: Other) (m2, kg).
- 5703.90.00.00 Of other textile materials (under: Carpets and other textile floor coverings (including turf), tufted, whether or not made up) (m2, kg): General 3.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,NP,OM,P,PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.