HTS Heading 5704
Carpets and other textile floor coverings, of felt, not tufted or flocked, whether or not made up
All 6 HTS codes under heading 5704 (carpets and other textile floor), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.7%.
Every line of heading 5704
- 5704 Carpets and other textile floor coverings, of felt, not tufted or flocked, whether or not made up.
- 5704.10.00 Tiles, having a maximum surface area of 0.3 m2: General 4.7%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
- 5704.10.00.10 Of wool or fine animal hair (465) (m2, kg).
- 5704.10.00.90 Other (665) (under: Tiles, having a maximum surface area of 0.3 m2) (m2, kg).
- 5704.20.00 Tiles, having a maximum surface area exceeding 0.3m2 but not exceeding 1m2: General Free; Special none; Column 2 40%.
- 5704.20.00.10 Of wool or fine animal hair (465) (m2, kg).
- 5704.20.00.90 Other (665) (under: Tiles, having a maximum surface area exceeding 0.3m2 but not exceeding 1m2) (m2, kg).
- 5704.90.01 Other (under: Carpets and other textile floor coverings, of felt, not tufted or flocked, whether or not made up): General Free; Special none; Column 2 40%.
- 5704.90.01.10 Of wool or fine animal hair (465) (m2, kg).
- 5704.90.01.90 Other (665) (under: Other) (m2, kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.