HTS Heading 5705

Other carpets and other textile floor coverings, whether or not made up

All 6 HTS codes under heading 5705 (other carpets), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.3%.

Every line of heading 5705

  • 5705.00 Other carpets and other textile floor coverings, whether or not made up.
  • 5705.00.10.00 Of coir (under: Other carpets and other textile floor coverings, whether or not made up) (m2, kg): General Free; Special none; Column 2 16%.
  • 5705.00.20 Other (under: Other carpets and other textile floor coverings, whether or not made up): General 3.3%; Special Free (AU,B,BH, CL,CO,E*,IL,JO,KR,MA,NP,OM,P,PA, PE,S,SG); Column 2 35%.
  • 5705.00.20.05 Needlepoint (465) (under: Of wool or fine animal hair) (m2, kg).
  • 5705.00.20.15 Other (465) (under: Of wool or fine animal hair) (m2, kg).
  • 5705.00.20.20 Of cotton (369) (under: Other) (m2, kg).
  • 5705.00.20.30 Of man-made fibers (665) (under: Other) (m2, kg).
  • 5705.00.20.90 Other (under: Other) (m2, kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.