HTS Heading 5801

Woven pile fabrics and chenille fabrics, other than fabrics of heading 5802 or 5806

All 21 HTS codes under heading 5801 (woven pile fabrics and chenille fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 20.2%.

Every line of heading 5801

  • 5801 Woven pile fabrics and chenille fabrics, other than fabrics of heading 5802 or 5806.
  • 5801.10.00.00 Of wool or fine animal hair (414) (m², kg): General Free; Special none; Column 2 61.5%.
  • 5801.21.00.00 Uncut weft pile fabrics (224) (m², kg): General 20.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 5801.22 Cut corduroy (under: Of cotton).
  • 5801.22.10.00 Greater than 7.5 wales per cm (224) (m², kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 5801.22.90.00 Other (224) (under: Cut corduroy) (m², kg): General 20.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 5801.23.00.00 Other weft pile fabrics (224) (m², kg): General 10%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 44%.
  • 5801.26.00 Chenille fabrics (under: Of cotton): General Free; Special none; Column 2 50%.
  • 5801.26.00.10 With chenille yarns on one side only (224) (m², kg).
  • 5801.26.00.20 Other (224) (under: Chenille fabrics) (m², kg).
  • 5801.27 Warp pile fabrics (under: Of cotton).
  • 5801.27.10.00 Epinglé (uncut) (224) (under: Warp pile fabrics) (m², kg): General 10.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 70%.
  • 5801.27.50 Cut (224) (under: Warp pile fabrics): General 18.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 70%.
  • 5801.27.50.10 Over 271 grams per square meter (224) (m², kg).
  • 5801.27.50.20 Other (224) (under: Cut (224)) (m², kg).
  • 5801.31.00.00 Uncut weft pile fabrics (224) (m², kg): General 17.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.32.00.00 Cut corduroy (224) (under: Of man-made fibers) (m², kg): General 14%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.33.00.00 Other weft pile fabrics (224) (m², kg): General 9.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.36.00 Chenille fabrics (under: Of man-made fibers): General 9.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.36.00.10 With chenille yarns on one side only (224) (m², kg).
  • 5801.36.00.20 Other (224) (under: Chenille fabrics) (m², kg).
  • 5801.37 Warp pile fabrics (under: Of man-made fibers).
  • 5801.37.10.00 Epinglé (uncut) (224) (under: Warp pile fabrics) (m², kg): General 14%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.37.50 Cut (under: Warp pile fabrics): General 17.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5801.37.50.10 Over 271 grams per square meter (224) (m², kg).
  • 5801.37.50.20 Other (224) (under: Cut) (m², kg).
  • 5801.90 Of other textile materials (under: Woven pile fabrics and chenille fabrics, other than fabrics of heading 5802 or 5806).
  • 5801.90.10.00 Of vegetable fibers, except cotton (810) (m², kg): General 3.7%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 50%.
  • 5801.90.20 Other (under: Of other textile materials): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 70%.
  • 5801.90.20.10 Containing 85 percent or more by weight of silk or silk waste (m², kg).
  • 5801.90.20.90 Other (810) (under: Other) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.