HTS Heading 5802

Terry toweling and similar woven terry fabrics, other than narrow fabrics of heading 5806; tufted textile fabrics, other than products of heading 5703

All 9 HTS codes under heading 5802 (terry toweling), with their duty rates from the 2026 HTS Revision 23. General duty 6.2% to 14%.

Every line of heading 5802

  • 5802 Terry toweling and similar woven terry fabrics, other than narrow fabrics of heading 5806; tufted textile fabrics, other than products of heading 5703.
  • 5802.10 Terry toweling and similar woven terry fabrics, of cotton.
  • 5802.10.10.00 Unbleached (224) (under: Terry toweling and similar woven terry fabrics, of cotton) (m², kg): General 9.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5802.10.90.00 Other (224) (under: Terry toweling and similar woven terry fabrics, of cotton) (m², kg): General 9.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5802.20.00 Terry toweling and similar woven terry fabrics, of other textile materials: General 14%; Special Free (AU,BH,CL, CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5802.20.00.10 Containing 85 percent or more by weight of silk or silk waste (m², kg).
  • 5802.20.00.20 Of man-made fibers (224) (under: Terry toweling and similar woven terry fabrics, of other textile materials) (m², kg).
  • 5802.20.00.90 Other (810) (under: Terry toweling and similar woven terry fabrics, of other textile materials) (m², kg).
  • 5802.30.00 Tufted textile fabrics (under: Terry toweling and similar woven terry fabrics, other than narrow fabrics of heading 5806; tufted textile fabrics, other than products of heading 5703): General 6.2%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 79.5%.
  • 5802.30.00.10 Containing 85 percent or more by weight of silk or silk waste (m², kg).
  • 5802.30.00.20 Of wool or fine animal hair (414) (m², kg).
  • 5802.30.00.30 Of cotton; of man-made fibers (224) (m², kg).
  • 5802.30.00.90 Other (810) (under: Tufted textile fabrics) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.