HTS Chapter 58

Special woven fabrics; tufted textile fabrics; lace; tapestries; trimmings; embroidery

The 11 headings and 111 HTS codes of chapter 58 (special woven fabrics), with their duty rates from the 2026 HTS Revision 23.

The 11 headings of chapter 58

Where it sits in the schedule

Chapter 58 is in Section XI of the Harmonized System, textiles and apparel (chapters 50 to 63). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.