HTS Heading 5803

Gauze, other than narrow fabrics of heading 5806

All 7 HTS codes under heading 5803 (gauze), with their duty rates from the 2026 HTS Revision 23. General duty Free to 16.5%.

Every line of heading 5803

  • 5803.00 Gauze, other than narrow fabrics of heading 5806.
  • 5803.00.10.00 Of cotton (220) (under: Gauze, other than narrow fabrics of heading 5806) (m², kg): General Free; Special none; Column 2 41.75%.
  • 5803.00.20.00 Tapestry fabrics and upholstery fabrics of a weight not exceeding 140 g/m² (414) (m², kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
  • 5803.00.30.00 Other (414) (under: Of wool or fine animal hair) (m², kg): General 16.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
  • 5803.00.40.00 Of vegetable fibers, except cotton (810) (m², kg): General Free; Special none; Column 2 35%.
  • 5803.00.50.00 Of man-made fibers (220) (under: Of other textile materials) (m², kg): General Free; Special none; Column 2 81%.
  • 5803.00.90 Other (under: Of other textile materials): General Free; Special none; Column 2 60%.
  • 5803.00.90.10 Containing 85 percent or more by weight of silk or silk waste (m², kg).
  • 5803.00.90.90 Other (810) (under: Other) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.