HTS Heading 5804
Tulles and other net fabrics, not including woven, knitted or crocheted fabrics; lace in the piece, in strips or in motifs, other than fabrics of headings 6002 to 6006
All 10 HTS codes under heading 5804 (tulles and other net fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 13.2%.
Every line of heading 5804
- 5804 Tulles and other net fabrics, not including woven, knitted or crocheted fabrics; lace in the piece, in strips or in motifs, other than fabrics of headings 6002 to 6006.
- 5804.10 Tulles and other net fabrics (under: Tulles and other net fabrics, not including woven, knitted or crocheted fabrics; lace in the piece, in strips or in motifs, other than fabrics of headings 6002 to 6006).
- 5804.10.10.00 Of cotton or man-made fibers (229) (kg): General 6%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5804.10.90 Other (under: Tulles and other net fabrics): General Free; Special none; Column 2 90%.
- 5804.10.90.10 Containing 85 percent or more by weight of silk or silk waste (kg).
- 5804.10.90.90 Other (899) (under: Other) (kg).
- 5804.21.00.00 Of man-made fibers (229) (under: Mechanically made lace) (kg): General 12%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5804.29 Of other textile materials (under: Mechanically made lace).
- 5804.29.10.00 Of cotton (229) (under: Of other textile materials) (kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5804.29.90 Other (under: Of other textile materials): General 5%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5804.29.90.10 Containing 85 percent or more by weight of silk or silk waste (kg).
- 5804.29.90.90 Other (899) (under: Other) (kg).
- 5804.30.00 Hand-made lace (under: Tulles and other net fabrics, not including woven, knitted or crocheted fabrics; lace in the piece, in strips or in motifs, other than fabrics of headings 6002 to 6006): General 13.2%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
- 5804.30.00.10 Containing 85 percent or more by weight of silk or silk waste (kg).
- 5804.30.00.20 Of cotton; of man-made fibers (229) (kg).
- 5804.30.00.90 Other (899) (under: Hand-made lace) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.