HTS Heading 5805
Hand-woven tapestries of the type Gobelins, Flanders, Aubusson, Beauvais and the like, and needle-worked tapestries (for example, petit point, cross stitch), whether or not made up
All 6 HTS codes under heading 5805 (hand-woven tapestries), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 5805
- 5805.00 Hand-woven tapestries of the type Gobelins, Flanders, Aubusson, Beauvais and the like, and needle-worked tapestries (for example, petit point, cross stitch), whether or not made up.
- 5805.00.10.00 Hand-woven tapestries fit only for use as wall hangings and valued over $215 per square meter (m², kg): General Free; Special none; Column 2 Free.
- 5805.00.20.00 Certified hand-loomed and folklore products (m², kg): General Free; Special none; Column 2 64.5%.
- 5805.00.25.00 Other (414) (under: Of wool or fine animal hair) (m², kg): General Free; Special none; Column 2 64.5%.
- 5805.00.30.00 Of cotton (369) (under: Other) (m², kg): General Free; Special none; Column 2 40%.
- 5805.00.40 Other (under: Other): General Free; Special none; Column 2 74%.
- 5805.00.40.10 Of man-made fibers (666) (under: Other) (m², kg).
- 5805.00.40.90 Other (under: Other) (m², kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.