HTS Heading 5806

Narrow woven fabrics, other than goods of heading 5807; narrow fabrics consisting of warp without weft assembled by means of an adhesive (bolducs)

All 25 HTS codes under heading 5806 (narrow woven fabrics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.8%.

Every line of heading 5806

  • 5806 Narrow woven fabrics, other than goods of heading 5807; narrow fabrics consisting of warp without weft assembled by means of an adhesive (bolducs).
  • 5806.10 Woven pile fabrics (including terry toweling and similar terry fabrics) and chenille fabrics.
  • 5806.10.10.00 Of cotton (229) (under: Woven pile fabrics (including terry toweling and similar terry fabrics) and chenille fabrics) (kg): General 7.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 62.5%.
  • 5806.10.24.00 Fastener fabric tapes (229) (under: Of man-made fibers) (kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
  • 5806.10.28.00 Other (229) (under: Of man-made fibers) (kg): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
  • 5806.10.30 Other (under: Woven pile fabrics (including terry toweling and similar terry fabrics) and chenille fabrics): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 59%.
  • 5806.10.30.10 Containing 85 percent or more by weight of silk or silk waste (kg).
  • 5806.10.30.20 Of wool or fine animal hair (414) (kg).
  • 5806.10.30.90 Other (899) (under: Other) (kg).
  • 5806.20.00 Other woven fabrics, containing by weight 5 percent or more of elastomeric yarn or rubber thread: General 7%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 5806.20.00.10 Containing elastomeric yarn (229) (kg).
  • 5806.20.00.90 Other (229) (under: Other woven fabrics, containing by weight 5 percent or more of elastomeric yarn or rubber thread) (kg).
  • 5806.31.00.00 Of cotton (229) (under: Other woven fabrics) (kg): General 8.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 5806.32 Of man-made fibers (under: Other woven fabrics).
  • 5806.32.10 Ribbons (under: Of man-made fibers): General 6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 76.5%.
  • 5806.32.10.10 Suitable for the manufacture of typewriter or similar ribbons of heading 9612 (621) (kg).
  • 5806.32.10.20 Containing wire in selvedge (229) (kg).
  • 5806.32.10.30 Other (229) (under: With woven selvedge) (kg).
  • 5806.32.10.40 Other (229) (under: Of polyester) (kg).
  • 5806.32.10.50 Containing wire in selvedge (229) (kg).
  • 5806.32.10.60 Other (229) (under: With woven selvedge) (kg).
  • 5806.32.10.70 Other (229) (under: Of nylon) (kg).
  • 5806.32.10.80 Other (229) (under: Of a width not exceeding 12 cm) (kg).
  • 5806.32.10.95 Other (229) (under: Other) (kg).
  • 5806.32.20.00 Other (229) (under: Of man-made fibers) (kg): General 6.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84%.
  • 5806.39 Of other textile materials (under: Other woven fabrics).
  • 5806.39.10.00 Of wool or fine animal hair (414) (kg): General 6.6%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 59%.
  • 5806.39.20.00 Of vegetable fibers, except cotton (899) (kg): General 4.9%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 5806.39.30 Other (under: Of other textile materials): General Free; Special none; Column 2 65%.
  • 5806.39.30.10 Containing 85 percent or more by weight of silk or silk waste (kg).
  • 5806.39.30.20 Of metalized yarn (229) (under: Other) (kg).
  • 5806.39.30.80 Other (899) (under: Other) (kg).
  • 5806.40.00.00 Fabrics consisting of warp without weft assembled by means of an adhesive (bolducs) (kg): General 8%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 83.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.