HTS Heading 5807

Labels, badges and similar articles of textile materials, in the piece, in strips or cut to shape or size, not embroidered

All 12 HTS codes under heading 5807 (labels), with their duty rates from the 2026 HTS Revision 23. General duty 3.3% to 7.9%.

Every line of heading 5807

  • 5807 Labels, badges and similar articles of textile materials, in the piece, in strips or cut to shape or size, not embroidered.
  • 5807.10 Woven (under: Labels, badges and similar articles of textile materials, in the piece, in strips or cut to shape or size, not embroidered).
  • 5807.10.05 Of cotton or man-made fibers (under: Labels): General 7.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 71.5%.
  • 5807.10.05.10 Of cotton (369) (under: Of cotton or man-made fibers) (kg).
  • 5807.10.05.20 Other (669) (under: Of cotton or man-made fibers) (kg).
  • 5807.10.15.00 Other (under: Labels) (kg): General 4.5%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 71.5%.
  • 5807.10.20 Other (under: Woven): General 3.3%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5807.10.20.10 Of cotton (under: Other) (kg).
  • 5807.10.20.20 Of man-made fibers (under: Other) (kg).
  • 5807.10.20.90 Other (under: Other) (kg).
  • 5807.90 Other (under: Labels, badges and similar articles of textile materials, in the piece, in strips or cut to shape or size, not embroidered).
  • 5807.90.05 Of cotton or man-made fibers (under: Labels): General 7.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 71.5%.
  • 5807.90.05.10 Of cotton (369) (under: Of cotton or man-made fibers) (kg).
  • 5807.90.05.20 Other (669) (under: Of cotton or man-made fibers) (kg).
  • 5807.90.15.00 Other (under: Labels) (kg): General 4.5%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 71.5%.
  • 5807.90.20 Other (under: Other): General 3.3%; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5807.90.20.10 Of cotton (under: Other) (kg).
  • 5807.90.20.20 Of man-made fibers (under: Other) (kg).
  • 5807.90.20.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.