HTS Heading 5808
Braids in the piece; ornamental trimmings in the piece, without embroidery, other than knitted or crocheted; tassels, pompons and similar articles
All 7 HTS codes under heading 5808 (braids in the piece), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.4%.
Every line of heading 5808
- 5808 Braids in the piece; ornamental trimmings in the piece, without embroidery, other than knitted or crocheted; tassels, pompons and similar articles.
- 5808.10 Braids in the piece (under: Braids in the piece; ornamental trimmings in the piece, without embroidery, other than knitted or crocheted; tassels, pompons and similar articles).
- 5808.10.10.00 Of abaca or ramie (899) (under: Suitable for making or ornamenting headwear) (kg): General Free; Special none; Column 2 25%.
- 5808.10.40.00 Of cotton or man-made fibers (229) (kg): General 3.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5808.10.50.00 Of other textile materials (under: Suitable for making or ornamenting headwear) (kg): General Free; Special none; Column 2 90%.
- 5808.10.70.00 Of cotton or man-made fibers (229) (kg): General 7.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5808.10.90.00 Other (under: Other) (kg): General 4.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
- 5808.90.00 Other (under: Braids in the piece; ornamental trimmings in the piece, without embroidery, other than knitted or crocheted; tassels, pompons and similar articles): General 3.9%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5808.90.00.10 Of cotton; of man-made fibers (229) (kg).
- 5808.90.00.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.