HTS Heading 5809
Woven fabrics of metal thread and woven fabrics of metalized yarn of heading 5605, of a kind used in apparel, as furnishing fabrics or for similar purposes, not elsewhere specified or included (229)
The HTS code under heading 5809 (woven fabrics of metal thread), with its duty rates from the 2026 HTS Revision 23. General duty 14.9%.
Every line of heading 5809
- 5809.00.00.00 Woven fabrics of metal thread and woven fabrics of metalized yarn of heading 5605, of a kind used in apparel, as furnishing fabrics or for similar purposes, not elsewhere specified or included (229) (m², kg): General 14.9%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 81%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.