HTS Heading 5810
Embroidery in the piece, in strips or in motifs
All 9 HTS codes under heading 5810 (embroidery in the piece, in strips or in motifs), with their duty rates from the 2026 HTS Revision 23. General duty 14.1%.
Every line of heading 5810
- 5810 Embroidery in the piece, in strips or in motifs.
- 5810.10.00.00 Embroidery without visible ground (229) (kg): General 14.1%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
- 5810.91.00 Of cotton (under: Other embroidery): General See additional U.S. note 1; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 See additional U.S. note 1.
- 5810.91.00.10 Weighing over 200 g/m² (under: Of cotton) (kg).
- 5810.91.00.20 Other (under: Of cotton) (kg).
- 5810.92 Of man-made fibers (under: Other embroidery).
- 5810.92.10.00 Badges, emblems and motifs (under: Of man-made fibers) (kg): General See additional U.S. note 2; Special Free (AU,BH, CL,CO,E*,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 See additional U.S. note 2.
- 5810.92.90 Other (under: Of man-made fibers): General See additional U.S. note 3; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 See additional U.S. note 3.
- 5810.92.90.30 Labels (669) (under: Other) (kg).
- 5810.92.90.50 On a ground fabric weighing less than 100 g/m² and of a width of more than 225 cm (kg).
- 5810.92.90.80 Other (under: Other) (kg).
- 5810.99 Of other textile materials (under: Other embroidery).
- 5810.99.10.00 Of wool or fine animal hair (414) (kg): General See additional U.S. note 4; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 See additional U.S. note 4.
- 5810.99.90.00 Other (under: Of other textile materials) (kg): General See additional U.S. note 5; Special Free (AU,BH, CL,CO,E*,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 See additional U.S. note 5.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.