HTS Heading 5811
Quilted textile products in the piece, composed of one or more layers of textile materials assembled with padding by stitching or otherwise, other than embroidery of heading 5810
All 4 HTS codes under heading 5811 (quilted textile products in the piece), with their duty rates from the 2026 HTS Revision 23. General duty Free to 13.2%.
Every line of heading 5811
- 5811.00 Quilted textile products in the piece, composed of one or more layers of textile materials assembled with padding by stitching or otherwise, other than embroidery of heading 5810.
- 5811.00.10.00 Of wool or fine animal hair (414) (m², kg): General 13.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 57%.
- 5811.00.20.00 Of cotton (229) (under: Quilted textile products in the piece, composed of one or more layers of textile materials assembled with padding by stitching or otherwise, other than embroidery of heading 5810) (m², kg): General 6.3%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
- 5811.00.30.00 Of man-made fibers (229) (under: Quilted textile products in the piece, composed of one or more layers of textile materials assembled with padding by stitching or otherwise, other than embroidery of heading 5810) (m², kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 83.5%.
- 5811.00.40.00 Of other textile materials (under: Quilted textile products in the piece, composed of one or more layers of textile materials assembled with padding by stitching or otherwise, other than embroidery of heading 5810) (m², kg): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.