HTS Heading 5901

Textile fabrics coated with gum or amylaceous substances, of a kind used for the outer covers of books or the like; tracing cloth; prepared painting canvas; buckram and similar stiffened textile fabrics of a kind used for hat foundations

All 4 HTS codes under heading 5901 (textile fabrics coated with gum), with their duty rates from the 2026 HTS Revision 23. General duty 4.1% to 7%.

Every line of heading 5901

  • 5901 Textile fabrics coated with gum or amylaceous substances, of a kind used for the outer covers of books or the like; tracing cloth; prepared painting canvas; buckram and similar stiffened textile fabrics of a kind used for hat foundations.
  • 5901.10 Textile fabrics coated with gum or amylaceous sub- stances, of a kind used for the outer covers of books or the like.
  • 5901.10.10.00 Of man-made fibers (229) (under: Textile fabrics coated with gum or amylaceous sub- stances, of a kind used for the outer covers of books or the like) (m2, kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 74.5%.
  • 5901.10.20.00 Other (229) (under: Textile fabrics coated with gum or amylaceous sub- stances, of a kind used for the outer covers of books or the like) (m2, kg): General 4.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 5901.90 Other (under: Textile fabrics coated with gum or amylaceous substances, of a kind used for the outer covers of books or the like; tracing cloth; prepared painting canvas; buckram and similar stiffened textile fabrics of a kind used for hat foundations).
  • 5901.90.20.00 Of man-made fibers (229) (under: Other) (m2, kg): General 7%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 74.5%.
  • 5901.90.40.00 Other (229) (under: Other) (m2, kg): General 4.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.