HTS Heading 5902
Tire cord fabric of high tenacity yarn of nylon or other poly- amides, polyesters or viscose rayon
All 3 HTS codes under heading 5902 (tire cord fabric), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.
Every line of heading 5902
- 5902 Tire cord fabric of high tenacity yarn of nylon or other poly- amides, polyesters or viscose rayon.
- 5902.10.00.00 Of nylon or other polyamides (229) (kg): General 5.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 5902.20.00.00 Of polyesters (229) (under: Tire cord fabric of high tenacity yarn of nylon or other poly- amides, polyesters or viscose rayon) (kg): General 5.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 5902.90.00.00 Other (229) (under: Tire cord fabric of high tenacity yarn of nylon or other poly- amides, polyesters or viscose rayon) (kg): General Free; Special none; Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.