HTS Heading 5903

Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902

All 21 HTS codes under heading 5903 (textile fabrics impregnated, coated), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.1%.

Every line of heading 5903

  • 5903 Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902.
  • 5903.10 With poly(vinyl chloride) (under: Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902).
  • 5903.10.10.00 Of cotton (under: With poly(vinyl chloride)) (m2, kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 5903.10.15.00 Over 60 percent by weight of plastics (m2, kg): General Free; Special none; Column 2 40%.
  • 5903.10.18.00 Other (229) (under: Fabrics specified in note 9 to section XI) (m2, kg): General 14.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 83.5%.
  • 5903.10.20 Over 70 percent by weight of rubber or plastics: General Free; Special none; Column 2 25%.
  • 5903.10.20.10 Fabrics, of yarns sheathed with poly(vinyl chloride), not otherwise impregnated, coated, covered or laminated (m2, kg).
  • 5903.10.20.90 Other (under: Over 70 percent by weight of rubber or plastics) (m2, kg).
  • 5903.10.25.00 Other (229) (under: Other) (m2, kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
  • 5903.10.30.00 Other (under: With poly(vinyl chloride)) (m2, kg): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5903.20 With polyurethane (under: Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902).
  • 5903.20.10.00 Of cotton (under: With polyurethane) (m2, kg): General 2.7%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR, MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 5903.20.15.00 Over 60 percent by weight of plastics (m2, kg): General Free; Special none; Column 2 40%.
  • 5903.20.18.00 Other (229) (under: Fabrics specified in note 9 to section XI) (m2, kg): General 8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 83.5%.
  • 5903.20.20.00 Over 70 percent by weight of rubber or plastics (m2, kg): General Free; Special none; Column 2 25%.
  • 5903.20.25.00 Other (229) (under: Other) (m2, kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
  • 5903.20.30 Other (under: With polyurethane): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 5903.20.30.10 Of wool or fine animal hair (414) (m2, kg).
  • 5903.20.30.90 Other (under: Other) (m2, kg).
  • 5903.90 Other (under: Textile fabrics impregnated, coated, covered or laminated with plastics, other than those of heading 5902).
  • 5903.90.10.00 Of cotton (under: Other) (m2, kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 5903.90.15.00 Over 60 percent by weight of plastics (m2, kg): General Free; Special none; Column 2 40%.
  • 5903.90.18.00 Other (229) (under: Fabrics specified in note 9 to section XI) (m2, kg): General 8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 83.5%.
  • 5903.90.20.00 Over 70 percent by weight of rubber or plastics (m2, kg): General Free; Special none; Column 2 25%.
  • 5903.90.25.00 Other (229) (under: Other) (m2, kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PE,S,SG); Column 2 84.5%.
  • 5903.90.30 Other (under: Other): General 2.7%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 40%.
  • 5903.90.30.10 Of wool or fine animal hair (414) (m2, kg).
  • 5903.90.30.90 Other (under: Other) (m2, kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.