HTS Heading 5904

Linoleum, whether or not cut to shape; floor coverings con- sisting of a coating or covering applied on a textile backing, whether or not cut to shape

All 3 HTS codes under heading 5904 (linoleum, whether or not cut to shape), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5904

  • 5904 Linoleum, whether or not cut to shape; floor coverings con- sisting of a coating or covering applied on a textile backing, whether or not cut to shape.
  • 5904.10.00.00 Linoleum (under: Linoleum, whether or not cut to shape; floor coverings con- sisting of a coating or covering applied on a textile backing, whether or not cut to shape) (m2, kg): General Free; Special none; Column 2 35%.
  • 5904.90 Other (under: Linoleum, whether or not cut to shape; floor coverings con- sisting of a coating or covering applied on a textile backing, whether or not cut to shape).
  • 5904.90.10.00 With a base consisting of needleloom felt or non- wovens (m2, kg): General Free; Special none; Column 2 40%.
  • 5904.90.90.00 Other (under: Other) (m2, kg): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.