HTS Heading 5905
Textile wall coverings
All 2 HTS codes under heading 5905 (textile wall coverings), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 5905
- 5905.00 Textile wall coverings.
- 5905.00.10.00 Backed with permanently affixed paper (m2, kg): General Free; Special none; Column 2 3.3¢/kg + 20%.
- 5905.00.90.00 Other (229) (under: Textile wall coverings) (m2, kg): General Free; Special none; Column 2 74%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.