HTS Heading 5911
Textile products and articles, for technical uses, specified in note 8 to this chapter
All 16 HTS codes under heading 5911 (textile products and articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.
Every line of heading 5911
- 5911 Textile products and articles, for technical uses, specified in note 8 to this chapter.
- 5911.10 Textile fabrics, felt and felt-lined woven fabrics, coated, covered or laminated with rubber, leather or other material, of a kind used for card clothing, and similar fabrics of a kind used for other technical purposes, including narrow fabrics made of velvet impregnated with rubber, for covering weaving spindles (weaving beams).
- 5911.10.10.00 Printers' rubberized blankets (kg): General 2.9%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
- 5911.10.20.00 Other (under: Textile fabrics, felt and felt-lined woven fabrics, coated, covered or laminated with rubber, leather or other material, of a kind used for card clothing, and similar fabrics of a kind used for other technical purposes, including narrow fabrics made of velvet impregnated with rubber, for covering weaving spindles (weaving beams)) (kg): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5911.20 Bolting cloth, whether or not made up.
- 5911.20.10.00 Fabrics principally used for stenciling purposes in screen-process printing (m2, kg): General 3.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 62%.
- 5911.20.20.00 Of silk (under: Other) (m2, kg): General Free; Special none; Column 2 Free.
- 5911.20.30.00 Other (229) (under: Other) (m2, kg): General Free; Special none; Column 2 63%.
- 5911.31.00 Weighing less than 650 g/m2 (under: Textile fabrics and felts, endless or fitted with linking devices, of a kind used in papermaking or similar machines (for example, for pulp or asbestos-cement)): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5911.31.00.10 Press felts (under: Weighing less than 650 g/m2) (m2, kg).
- 5911.31.00.20 Dryer felts and dryer fabrics (m2, kg).
- 5911.31.00.30 Paper-forming fabrics (under: Weighing less than 650 g/m2) (m2, kg).
- 5911.31.00.80 Other (under: Weighing less than 650 g/m2) (m2, kg).
- 5911.32.00 Weighing 650 g/m2 or more (under: Textile fabrics and felts, endless or fitted with linking devices, of a kind used in papermaking or similar machines (for example, for pulp or asbestos-cement)): General 3.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 68.5%.
- 5911.32.00.10 Press felts (under: Weighing 650 g/m2 or more) (m2, kg).
- 5911.32.00.20 Dryer felts and dryer fabrics (m2, kg).
- 5911.32.00.30 Paper-forming fabrics (under: Weighing 650 g/m2 or more) (m2, kg).
- 5911.32.00.80 Other (under: Weighing 650 g/m2 or more) (m2, kg).
- 5911.40.01.00 Filtering or straining cloth of a kind used in oil presses or the like, including that of human hair (m2, kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81%.
- 5911.90.00 Other (under: Textile products and articles, for technical uses, specified in note 8 to this chapter): General 3.8%; Special Free (AU,B,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 68.5%.
- 5911.90.00.40 Cords, braids and the like of a kind used in industry as packing or lubricating material (kg).
- 5911.90.00.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.