HTS Heading 6001

Pile fabrics, including "long pile" fabrics and terry fabrics, knitted or crocheted

All 13 HTS codes under heading 6001 (pile fabrics), with their duty rates from the 2026 HTS Revision 23. General duty 4% to 18.5%.

Every line of heading 6001

  • 6001 Pile fabrics, including "long pile" fabrics and terry fabrics, knitted or crocheted.
  • 6001.10 "Long pile" fabrics (under: Pile fabrics, including "long pile" fabrics and terry fabrics, knitted or crocheted).
  • 6001.10.20.00 Of man-made fibers (224) (under: "Long pile" fabrics) (m2, kg): General 17.2%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 79.5%.
  • 6001.10.60.00 Other (224) (under: "Long pile" fabrics) (m2, kg): General 9%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 40%.
  • 6001.21.00.00 Of cotton (224) (under: Looped pile fabrics) (m2, kg): General 9.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 40%.
  • 6001.22.00.00 Of man-made fibers (224) (under: Looped pile fabrics) (m2, kg): General 17.2%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 79.5%.
  • 6001.29.00.00 Of other textile materials (414) (kg): General 7%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 61.5%.
  • 6001.91.00 Of cotton (under: Other): General 18.5%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 70%.
  • 6001.91.00.10 Over 271 grams per square meter (224) (m2, kg).
  • 6001.91.00.20 Other (224) (under: Of cotton) (m2, kg).
  • 6001.92.00 Of man-made fibers (under: Other): General 17.2%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 79.5%.
  • 6001.92.00.10 Velour (224) (under: Over 271 grams per square meter) (m2, kg).
  • 6001.92.00.20 Other (224) (under: Over 271 grams per square meter) (m2, kg).
  • 6001.92.00.30 Velour (224) (under: Other) (m2, kg).
  • 6001.92.00.40 Other (224) (under: Other) (m2, kg).
  • 6001.99 Of other textile materials (under: Other).
  • 6001.99.10.00 Containing 85 percent or more by weight of silk or silk waste (m2, kg): General 4%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 61.5%.
  • 6001.99.90.00 Other (414) (under: Of other textile materials) (m2, kg): General 7%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 61.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.