HTS Heading 6002

Knitted or crocheted fabrics of a width not exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001

All 6 HTS codes under heading 6002 (knitted or crocheted fabrics), with their duty rates from the 2026 HTS Revision 23. General duty 8% to 8.8%.

Every line of heading 6002

  • 6002 Knitted or crocheted fabrics of a width not exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001.
  • 6002.40 Containing by weight 5 percent or more of elastomeric yarn but not containing rubber thread.
  • 6002.40.40.00 Of cotton (222) (under: Containing by weight 5 percent or more of elastomeric yarn but not containing rubber thread) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 35%.
  • 6002.40.80 Other (under: Containing by weight 5 percent or more of elastomeric yarn but not containing rubber thread): General 8%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6002.40.80.20 Open-work fabrics, warp knit (222) (kg).
  • 6002.40.80.80 Other (222) (under: Other) (kg).
  • 6002.90 Other (under: Knitted or crocheted fabrics of a width not exceeding 30 cm, containing by weight 5 percent or more of elastomeric yarn or rubber thread, other than those of heading 6001).
  • 6002.90.40.00 Of cotton (222) (under: Other) (kg): General 8.8%; Special Free (AU,BH, CL,CO,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6002.90.80 Other (under: Other): General 8%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6002.90.80.20 Open-work fabrics, warp knit (222) (kg).
  • 6002.90.80.80 Other (222) (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.