HTS Heading 6303

Curtains (including drapes) and interior blinds; curtain or bed valances

All 14 HTS codes under heading 6303 (curtains (including drapes)), with their duty rates from the 2026 HTS Revision 23. General duty 6.4% to 11.3%.

Every line of heading 6303

  • 6303 Curtains (including drapes) and interior blinds; curtain or bed valances.
  • 6303.12.00 Of synthetic fibers (under: Knitted or crocheted): General 11.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6303.12.00.10 Window shades and window blinds (666) (No., kg).
  • 6303.12.00.90 Other (666) (under: Of synthetic fibers) (No., kg).
  • 6303.19 Of other textile materials (under: Knitted or crocheted).
  • 6303.19.11.00 Of cotton (369) (under: Of other textile materials) (No., kg): General 10.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6303.19.21 Other (under: Of other textile materials): General 6.4%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM,P, PA, PE,S,SG); Column 2 90%.
  • 6303.19.21.10 Of artificial fibers (666) (under: Other) (No., kg).
  • 6303.19.21.20 Other (899) (under: Other) (No., kg).
  • 6303.91.00 Of cotton (under: Other): General 10.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6303.91.00.10 Window curtains (including drapes) and window valances (369) (No., kg).
  • 6303.91.00.20 Other (369) (under: Of cotton) (No., kg).
  • 6303.92 Of synthetic fibers (under: Other).
  • 6303.92.10.00 Made up from fabrics described in subheading 5407.61.11, 5407.61.21 or 5407.61.91 (666) (No., kg): General 11.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6303.92.20 Other (under: Of synthetic fibers): General 11.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6303.92.20.10 Window curtains (including drapes) and window valances (666) (No., kg).
  • 6303.92.20.30 Window shades and window blinds (666) (No., kg).
  • 6303.92.20.50 Other (666) (under: Other) (No., kg).
  • 6303.99.00 Of other textile materials (under: Other): General 11.3%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 90%.
  • 6303.99.00.10 Of artificial fibers (666) (under: Of other textile materials) (No., kg).
  • 6303.99.00.30 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 6303.99.00.60 Other (899) (under: Other) (No., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.