HTS Heading 6504
Hats and other headgear, plaited or made by assembling strips of any material, whether or not lined or trimmed
All 6 HTS codes under heading 6504 (hats and other headgear), with their duty rates from the 2026 HTS Revision 23. General duty 4.6% to 6.8%, some per unit.
Every line of heading 6504
- 6504.00 Hats and other headgear, plaited or made by assembling strips of any material, whether or not lined or trimmed.
- 6504.00.30.00 Sewed (under: Of vegetable fibers, of unspun fibrous vegetable materials, of paper yarn or of any combination thereof) (doz., kg): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $3/doz. + 50%.
- 6504.00.60.00 Not sewed (under: Of vegetable fibers, of unspun fibrous vegetable materials, of paper yarn or of any combination thereof) (doz., kg): General 94¢/doz. + 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $3.50/doz. + 50%.
- 6504.00.90 Other (under: Hats and other headgear, plaited or made by assembling strips of any material, whether or not lined or trimmed): General 6.8%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,NP,OM,P,PA, PE,S,SG); Column 2 90%.
- 6504.00.90.15 Of man-made fibers (659) (under: Sewed) (doz., kg).
- 6504.00.90.45 Other (under: Sewed) (doz., kg).
- 6504.00.90.60 Of man-made fibers (659) (under: Not sewed) (doz., kg).
- 6504.00.90.75 Other (under: Not sewed) (doz., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.