HTS Heading 6912
Ceramic tableware, kitchenware, other household articles and toilet articles, other than of porcelain or china
All 13 HTS codes under heading 6912 (ceramic tableware, kitchenware), with their duty rates from the 2026 HTS Revision 23. General duty 0.7% to 28%.
Every line of heading 6912
- 6912.00 Ceramic tableware, kitchenware, other household articles and toilet articles, other than of porcelain or china.
- 6912.00.10.00 Of coarse-grained earthenware, or of coarse- grained stoneware; of fine-grained earthenware, whether or not decorated, having a reddish-colored body and a lustrous glaze which, on teapots, may be any color, but which, on other articles, must be mottled, streaked or solidly colored brown to black with metallic oxide or salt (Dz Pcs): General 0.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 6912.00.20.00 Hotel or restaurant ware and other ware not household ware (Dz Pcs): General 28%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.35 In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is not over $38: General 9.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.35.10 Plates not over 27.9 cm in maximum dimension; teacups and saucers; mugs; soups, fruits and cereals, the foregoing not over 22.9 cm in maximum dimension (Dz Pcs).
- 6912.00.35.50 Other (under: In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is not over $38) (Dz Pcs).
- 6912.00.39 In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is over $38: General 4.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.39.10 Plates not over 27.9 cm in maximum dimension; teacups and saucers; mugs; soups, fruits and cereals, the foregoing not over 22.9 cm in maximum dimension (Dz Pcs).
- 6912.00.39.50 Other (under: In any pattern for which the aggregate value of the articles listed in additional U.S. note 6(b) of this chapter is over $38) (Dz Pcs).
- 6912.00.41.00 Steins with permanently attached pewter lids; candy boxes, decanters, punch bowls, pretzel dishes, tidbit dishes, tiered servers, bonbon dishes, egg cups, spoons and spoon rests, oil and vinegar sets, tumblers and salt and pepper shaker sets (Dz Pcs): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.44.00 Mugs and other steins (under: Other) (Dz Pcs): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.45.00 Cups valued over $5.25 per dozen; saucers valued over $3 per dozen; soups, oatmeals and cereals valued over $6 per dozen; plates not over 22.9 cm in maximum diameter and valued over $6 per dozen; plates over 22.9 but not over 27.9 cm in maximum diameter and valued over $8.50 per dozen; platters or chop dishes valued over $35 per dozen; sugars valued over $21 per dozen; creamers valued over $15 per dozen; and beverage servers valued over $42 per dozen (Dz Pcs): General 4.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.46.00 Serviette rings (under: Other) (Dz Pcs): General 9.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.48 Other (under: Other): General 9.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
- 6912.00.48.10 Suitable for food or drink contact (Dz Pcs).
- 6912.00.48.90 Other (under: Other) (Dz Pcs).
- 6912.00.50.00 Other (under: Ceramic tableware, kitchenware, other household articles and toilet articles, other than of porcelain or china) (Dz Pcs): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.