HTS Heading 6913
Statuettes and other ornamental ceramic articles
All 7 HTS codes under heading 6913 (statuettes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.
Every line of heading 6913
- 6913 Statuettes and other ornamental ceramic articles.
- 6913.10 Of porcelain or china (under: Statuettes and other ornamental ceramic articles).
- 6913.10.10.00 Statues, statuettes and handmade flowers, valued over $2.50 each and produced by professional sculptors or directly from molds made from original models produced by professional sculptors (Dz Pcs): General Free; Special none; Column 2 20%.
- 6913.10.20.00 Of bone chinaware (under: Other) (Dz Pcs): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
- 6913.10.50.00 Other (under: Other) (Dz Pcs): General Free; Special none; Column 2 70%.
- 6913.90 Other (under: Statuettes and other ornamental ceramic articles).
- 6913.90.10.00 Statues, statuettes and handmade flowers, valued over $2.50 each and produced by professional sculptors or directly from molds made from original models produced by professional sculptors (Dz Pcs): General Free; Special none; Column 2 20%.
- 6913.90.20.00 Of ceramic tile (under: Other) (Dz Pcs): General Free; Special none; Column 2 50%.
- 6913.90.30.00 Of earthenware, whether or not decorated, having a reddish-colored body and a lustrous glaze, and mottled, streaked or solidly colored brown to black with metallic oxide or salt (Dz Pcs): General Free; Special none; Column 2 25%.
- 6913.90.50.00 Other (under: Other) (Dz Pcs): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 51.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.