HTS Heading 6914
Other ceramic articles
All 4 HTS codes under heading 6914 (other ceramic articles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 9%.
Every line of heading 6914
- 6914 Other ceramic articles.
- 6914.10 Of porcelain or china (under: Other ceramic articles).
- 6914.10.40.00 Ceramic ferrules of porcelain or china, not exceeding 3 mm in diameter or 25 mm in length, having a fiber channel opening and/or ceramic mating sleeves of alumina or zirconia (Dz Pcs): General Free; Special none; Column 2 60%.
- 6914.10.80.00 Other (under: Of porcelain or china) (Dz Pcs): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 6914.90 Other (under: Other ceramic articles).
- 6914.90.41.00 Ceramic ferrules of alumina or zirconia, not exceeding 3 mm in diameter or 25 mm in length, having a fiber channel opening and/or ceramic mating sleeves of alumina or zirconia (Dz Pcs): General Free; Special none; Column 2 45%.
- 6914.90.80.00 Other (under: Other) (Dz Pcs): General 5.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.