HTS Heading 7011

Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like

All 8 HTS codes under heading 7011 (glass envelopes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.6%.

Every line of heading 7011

  • 7011 Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like.
  • 7011.10 For electric lighting (under: Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like).
  • 7011.10.10.00 Bulbs for incandescent lamps (under: For electric lighting) (hundreds): General Free; Special none; Column 2 20%.
  • 7011.10.50.00 Other (under: For electric lighting) (hundreds): General 4.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 7011.20 For cathode-ray tubes (under: Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like).
  • 7011.20.10.00 Cones (under: For cathode-ray tubes) (hundreds): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 7011.20.45.00 Monochrome glass envelopes, the foregoing certified by the importer as being for actual use in automatic data processing machine data or graphic display cathode ray tubes (hundreds): General Free; Special none; Column 2 55%.
  • 7011.20.85 Other (under: Other): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 7011.20.85.10 With greatest diagonal measurement not exceeding 50 cm (hundreds).
  • 7011.20.85.25 Other (under: Front panels for cathode-ray television picture tubes, including video monitor tubes, color, non-projection) (hundreds).
  • 7011.20.85.40 Other (under: Other) (hundreds).
  • 7011.90.00.00 Other (under: Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like) (hundreds): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.