HTS Heading 7013

Glassware of a kind used for table, kitchen, toilet, office, indoor decoration or similar purposes (other than that of heading 7010 or 7018)

All 64 HTS codes under heading 7013 (glassware of a kind used for table), with their duty rates from the 2026 HTS Revision 23. General duty 3% to 38%.

Every line of heading 7013

  • 7013 Glassware of a kind used for table, kitchen, toilet, office, indoor decoration or similar purposes (other than that of heading 7010 or 7018).
  • 7013.10 Of glass-ceramics (under: Glassware of a kind used for table, kitchen, toilet, office, indoor decoration or similar purposes (other than that of heading 7010 or 7018)).
  • 7013.10.10.00 Kitchenware, non-glazed, greater than 75 percent by volume crystalline, of lithium aluminosilicate, having a linear coefficient of expansion not exceeding 10 x 10-7 per Kelvin within a temperature range of 0˚C to 300˚C, transparent, haze-free, exhibiting transmittances of infrared radiations in excess of 75 percent at a wavelength of 2.5 microns when measured on a sample 3 mm in thickness, and containing β-quartz solid solution as the predominant crystal phase (No.): General 6.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 7013.10.50.00 Other (under: Of glass-ceramics) (No.): General 26%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75%.
  • 7013.22 Of lead crystal (under: Stemware drinking glasses, other than of glass-ceramics).
  • 7013.22.10.00 Valued not over $1 each (under: Of lead crystal) (No.): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.22.20.00 Valued over $1 but not over $3 each (No.): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.22.30.00 Valued over $3 but not over $5 each (No.): General 7.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.22.50.00 Valued over $5 each (under: Of lead crystal) (No.): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.28 Other (under: Stemware drinking glasses, other than of glass-ceramics).
  • 7013.28.05.00 Pressed and toughened (specially tempered) (No.): General 12.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7013.28.10.00 Valued not over $0.30 each (under: Other) (No.): General 28.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 60%.
  • 7013.28.20 Valued over $0.30 but not over $3 each: General 22.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 60%.
  • 7013.28.20.10 Crystalline or non-lead crystal (No.).
  • 7013.28.20.90 Other (under: Valued over $0.30 but not over $3 each) (No.).
  • 7013.28.30.00 Valued over $3 but not over $5 each (No.): General 11.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.28.40.00 Valued over $5 each (under: Cut or engraved) (No.): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.28.50 Valued over $3 but not over $5 each: General 7.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.28.50.10 Crystalline or non-lead crystal (No.).
  • 7013.28.50.90 Other (under: Valued over $3 but not over $5 each) (No.).
  • 7013.28.60 Valued over $5 each (under: Other): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.28.60.10 Crystalline or non-lead crystal (No.).
  • 7013.28.60.90 Other (under: Valued over $5 each) (No.).
  • 7013.33 Of lead crystal (under: Other drinking glasses, other than of glass-ceramics).
  • 7013.33.10.00 Valued not over $1 each (under: Of lead crystal) (No.): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.33.20.00 Valued over $1 but not over $3 each (No.): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.33.30.00 Valued over $3 but not over $5 each (No.): General 7.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PE,S,SG); Column 2 60%.
  • 7013.33.50.00 Valued over $5 each (under: Of lead crystal) (No.): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37 Other (under: Other drinking glasses, other than of glass-ceramics).
  • 7013.37.05.00 Pressed and toughened (specially tempered) (No.): General 12.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7013.37.10.01 Valued not over $0.30 each (under: Other) (No.): General 28.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37.20 Valued over $0.30 but not over $3 each: General 22.5%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 60%.
  • 7013.37.20.10 Crystalline or non-lead crystal (No.).
  • 7013.37.20.90 Other (under: Valued over $0.30 but not over $3 each) (No.).
  • 7013.37.30.00 Valued over $3 but not over $5 each (No.): General 11.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37.40.00 Valued over $5 each (under: Cut or engraved) (No.): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37.50 Valued over $3 but not over $5 each: General 7.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37.50.10 Crystalline or non-lead crystal (No.).
  • 7013.37.50.90 Other (under: Valued over $3 but not over $5 each) (No.).
  • 7013.37.60 Valued over $5 each (under: Other): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.37.60.10 Crystalline or non-lead crystal (No.).
  • 7013.37.60.90 Other (under: Valued over $5 each) (No.).
  • 7013.41 Of lead crystal (under: Glassware of a kind used for table (other than drinking glasses) or kitchen purposes, other than of glass-ceramics).
  • 7013.41.10.00 Valued not over $1 each (under: Of lead crystal) (No.): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.41.20.00 Valued over $1 but not over $3 each (No.): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.41.30.00 Valued over $3 but not over $5 each (No.): General 10.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.41.50.00 Valued over $5 each (under: Of lead crystal) (No.): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.42 Of glass having a linear coefficient of expansion not exceeding 5 x 10-6 per Kelvin within a temperature range of 0˚C to 300˚C.
  • 7013.42.10.00 Pressed and toughened (specially tempered) (No.): General 12.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7013.42.20.00 Valued not over $3 each (under: Other) (No.): General 22.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.42.30.00 Valued over $3 but not over $5 each (No.): General 11.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.42.40.00 Valued over $5 each (under: Other) (No.): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.49 Other (under: Glassware of a kind used for table (other than drinking glasses) or kitchen purposes, other than of glass-ceramics).
  • 7013.49.10.00 Pressed and toughened (specially tempered) (No.): General 12.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7013.49.20 Valued not over $3 each (under: Other): General 22.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 60%.
  • 7013.49.20.10 Crystalline or non-lead crystal (No.).
  • 7013.49.20.90 Other (under: Valued not over $3 each) (No.).
  • 7013.49.30.00 Valued over $3 but not over $5 each (No.): General 11.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.49.40.00 Valued over $5 each (under: Cut or engraved) (No.): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.49.50 Valued over $3 but not over $5 each: General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.49.50.10 Crystalline or non-lead crystal (No.).
  • 7013.49.50.90 Other (under: Valued over $3 but not over $5 each) (No.).
  • 7013.49.60 Valued over $5 each (under: Other): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.49.60.10 Crystalline or non-lead crystal (No.).
  • 7013.49.60.90 Other (under: Valued over $5 each) (No.).
  • 7013.91 Of lead crystal (under: Other glassware).
  • 7013.91.10.00 Valued not over $1 each (under: Of lead crystal) (No.): General 20%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.91.20.00 Valued over $1 but not over $3 each (No.): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.91.30.00 Valued over $3 but not over $5 each (No.): General 10.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.91.50.00 Valued over $5 each (under: Of lead crystal) (No.): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99 Other (under: Other glassware).
  • 7013.99.10.00 Glassware decorated with metal flecking, glass pictorial scenes or glass thread- or ribbon-like effects, any of the foregoing embedded or introduced into the body of the glassware prior to its solidification; millefiori glassware; glassware colored prior to solidification, and characterized by random distribution of numerous bubbles, seeds or stones, throughout the mass of the glass (No.): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.20.00 Pressed and toughened (specially tempered) (No.): General 12.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7013.99.30.00 Smokers' articles; perfume bottles fitted with ground glass stoppers (No.): General 9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.35.00 Votive-candle holders (under: Other) (No.): General 6.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 7013.99.40.01 Valued not over $0.30 each (under: Other) (No.): General 38%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.50 Valued over $0.30 but not over $3 each: General 30%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.50.10 Crystalline or non-lead crystal (No.).
  • 7013.99.50.90 Other (under: Valued over $0.30 but not over $3 each) (No.).
  • 7013.99.60.00 Valued over $3 but not over $5 each (No.): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.70.00 Valued over $5 each (under: Cut or engraved) (No.): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.80 Valued over $3 but not over $5 each: General 11.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.80.10 Crystalline or non-lead crystal (No.).
  • 7013.99.80.90 Other (under: Valued over $3 but not over $5 each) (No.).
  • 7013.99.90 Valued over $5 each (under: Other): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7013.99.90.10 Crystalline or non-lead crystal (No.).
  • 7013.99.90.90 Other (under: Valued over $5 each) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.