HTS Heading 7014
Signaling glassware and optical elements of glass (other than those of heading 7015), not optically worked
All 4 HTS codes under heading 7014 (signaling glassware), with their duty rates from the 2026 HTS Revision 23. General duty 3.3% to 5%.
Every line of heading 7014
- 7014.00 Signaling glassware and optical elements of glass (other than those of heading 7015), not optically worked.
- 7014.00.10.00 Lens blanks (other than for spectacles) (No.): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7014.00.20.00 Other (under: Optical elements) (No.): General 5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7014.00.30.00 Lenses and filters, and parts thereof (No.): General 3.4%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7014.00.50.00 Other (under: Other) (No.): General 3.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.