HTS Heading 7103

Precious stones (other than diamonds) and semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded precious stones (other than diamonds) and semiprecious stones, temporarily strung for convenience of transport

All 7 HTS codes under heading 7103 (precious stones), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.5%.

Every line of heading 7103

  • 7103 Precious stones (other than diamonds) and semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded precious stones (other than diamonds) and semiprecious stones, temporarily strung for convenience of transport.
  • 7103.10 Unworked or simply sawn or roughly shaped.
  • 7103.10.20.00 Unworked (under: Unworked or simply sawn or roughly shaped) (carat): General Free; Special none; Column 2 Free.
  • 7103.10.40.00 Other (under: Unworked or simply sawn or roughly shaped) (carat): General 10.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7103.91.00 Rubies, sapphires and emeralds: General Free; Special none; Column 2 10%.
  • 7103.91.00.10 Rubies (under: Rubies, sapphires and emeralds) (carat).
  • 7103.91.00.20 Sapphires (under: Rubies, sapphires and emeralds) (carat).
  • 7103.91.00.30 Emeralds (under: Rubies, sapphires and emeralds) (carat).
  • 7103.99 Other (under: Otherwise worked).
  • 7103.99.10.00 Cut but not set, and suitable for use in the manufacture of jewelry (carat): General Free; Special none; Column 2 10%.
  • 7103.99.50.00 Other (under: Other) (carat): General 10.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.