HTS Heading 7104
Synthetic or reconstructed precious or semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded synthetic or reconstructed precious or semiprecious stones, temporarily strung for convenience of transport
All 7 HTS codes under heading 7104 (synthetic or reconstructed precious), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%.
Every line of heading 7104
- 7104 Synthetic or reconstructed precious or semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded synthetic or reconstructed precious or semiprecious stones, temporarily strung for convenience of transport.
- 7104.10.00.00 Piezo-electric quartz (under: Synthetic or reconstructed precious or semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded synthetic or reconstructed precious or semiprecious stones, temporarily strung for convenience of transport) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7104.21.00.00 Diamonds (under: Other, unworked or simply sawn or roughly shaped) (g): General 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 30%.
- 7104.29.00.00 Other (under: Other, unworked or simply sawn or roughly shaped) (g): General 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 30%.
- 7104.91 Diamonds (under: Other).
- 7104.91.10.00 Cut but not set, and suitable for use in the manufacture of jewelry (No.): General Free; Special none; Column 2 10%.
- 7104.91.50.00 Other (under: Diamonds) (g): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7104.99 Other (under: Other).
- 7104.99.10.00 Cut but not set, and suitable for use in the manufacture of jewelry (No.): General Free; Special none; Column 2 10%.
- 7104.99.50.00 Other (under: Other) (g): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.