HTS Heading 7112
Waste and scrap of precious metal or of metal clad with precious metal; other waste and scrap containing precious metal or precious metal compounds, of a kind used principally for the recovery of precious metal other than goods of heading 8549
All 4 HTS codes under heading 7112 (waste and scrap of precious metal or of metal clad), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7112
- 7112 Waste and scrap of precious metal or of metal clad with precious metal; other waste and scrap containing precious metal or precious metal compounds, of a kind used principally for the recovery of precious metal other than goods of heading 8549.
- 7112.30.01.00 Ash containing precious metal or precious metal compounds (kg): General Free; Special none; Column 2 Free.
- 7112.91.01.00 Of gold, including metal clad with gold but excluding sweepings containing other precious metals (g, Au g): General Free; Special none; Column 2 Free.
- 7112.92.01.00 Of platinum, including metal clad with platinum but excluding sweepings containing other precious metals (g, Pt g): General Free; Special none; Column 2 Free.
- 7112.99.01.00 Other (under: Other) (g): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.