HTS Heading 7113
Articles of jewelry and parts thereof, of precious metal or of metal clad with precious metal
All 21 HTS codes under heading 7113 (articles of jewelry and parts thereof), with their duty rates from the 2026 HTS Revision 23. General duty 5% to 13.5%.
Every line of heading 7113
- 7113 Articles of jewelry and parts thereof, of precious metal or of metal clad with precious metal.
- 7113.11 Of silver, whether or not plated or clad with other precious metal.
- 7113.11.10.00 Rope, curb, cable, chain and similar articles produced in continuous lengths, all the foregoing, whether or not cut to specific lengths and whether or not set with imitation pearls or imitation gemstones, suitable for use in the manufacture of articles provided for in this heading (g): General 6.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.11.20.00 Valued not over $18 per dozen pieces or parts (g): General 13.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 7113.11.50.00 Other (under: Other) (g): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19 Of other precious metal, whether or not plated or clad with precious metal.
- 7113.19.10.00 Rope, curb, cable, chain and similar articles produced in continuous lengths, all the foregoing, whether or not cut to specific lengths and whether or not set with imitation pearls or imitation gemstones, suitable for use in the manufacture of articles provided for in this heading (g): General 7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.21.00 Rope (under: Necklaces and neck chains, of gold) (g): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.25.00 Mixed link (under: Necklaces and neck chains, of gold) (g): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.29 Other (under: Necklaces and neck chains, of gold): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.29.10 Uniform link (under: Other) (g).
- 7113.19.29.90 Other (under: Other) (g).
- 7113.19.30.00 Clasps and parts thereof (under: Other) (g): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.50 Other (under: Other): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.19.50.21 Necklaces and neck chains (under: Of ISO standard platinum) (pcs).
- 7113.19.50.25 Rings (under: Of ISO standard platinum) (pcs).
- 7113.19.50.30 Earrings (under: Of ISO standard platinum) (pcs).
- 7113.19.50.45 Other (under: Of ISO standard platinum) (pcs).
- 7113.19.50.91 Articles of jewelry, of gold, other than rope, curb, cable, chain, necklaces, neck chains or clasps (pcs).
- 7113.19.50.95 Other (under: Other) (g).
- 7113.20 Of base metal clad with precious metal.
- 7113.20.10.00 Rope, curb, cable, chain and similar articles produced in continuous lengths, all the foregoing, whether or not cut to specific lengths and whether or not set with imitation pearls or imitation gemstones, suitable for use in the manufacture of articles provided for in this heading (g): General 7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.20.21.00 Rope (under: Necklaces and neck chains, clad with gold) (g): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.20.25.00 Mixed link (under: Necklaces and neck chains, clad with gold) (g): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.20.29.00 Other (under: Necklaces and neck chains, clad with gold) (g): General 5.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.20.30.00 Clasps and parts thereof (under: Other) (g): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7113.20.50.00 Other (under: Other) (g): General 5.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.